Walgreens announced plans last week to build one of the nation's first net-zero retail stores. The Evanston, Ill., location will utilize solar panels, wind turbines, geothermal technology, LED lighting and ultra-high-efficiency refrigeration to produce energy equal to or greater than the building consumes.
The Chicago-area location will allow convenient access for Walgreens engineers based at the company’s headquarters in Deerfield, Ill., to measure the store’s performance for an entire year to determine if the store reaches its goal of net zero energy use.
Walgreens plans to generate electricity and reduce its usage by more than 40 percent through several technologies in the store including:
- more than 800 roof-top solar panels
- two wind turbines
- geothermal energy obtained by drilling 550-feet into the ground below the store, where temperatures are more constant and can be tapped to heat or cool the store in winter and summer
- LED lighting and daylight harvesting
- carbon dioxide refrigerant for heating, cooling and refrigeration equipment
- energy efficient building materials.
Engineering estimates--which can vary due to factors such as weather, store operations and systems performance- indicate that the store will use 200,000 kilowatt hours per year of electricity while generating 256,000 kilowatt hours per year.
Over the past year, Walgreens engineers have worked with the city of Evanston and vendors, including Trane, CREE Lighting, Acuity Lighting, Cooper Lighting, CalStar Products, GE Lighting, Geothermal International, SoCore Energy, Wing Power and Camburas and Theodore Architects.
(http://news.walgreens.com/article_display.cfm?article_id=5717)
Related Stories
| Feb 21, 2012
SMPS announces Build Business 2012 keynote speakers
National conference set for July 11–13 in San Francisco.
| Feb 20, 2012
Comment period for update to USGBC's LEED Green Building Program now open
This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.
| Feb 20, 2012
Sto Corp. announces new technical director for Canada
Edgar will have full responsibility of specifications, details, website technical content, testing and approvals, and will support the Canada sales team.
| Feb 20, 2012
GAF introduces web portal for architects and specifiers
The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.
| Feb 20, 2012
All Steel names Breagy director of metro New York
Breagy is responsible for overseeing this region’s sales team while strategically coordinating the sales efforts of Allsteel dealers and representatives in the tri-state area.
| Feb 17, 2012
Tremco Inc. headquarters achieves LEED Gold certification
Changes were so extensive that the certification is for new construction and not for renovation; officially, the building is LEED-NC.
| Feb 17, 2012
MacInnis joins Gilbane board of directors
MacInnis is the chairman and recently retired CEO of Connecticut-based EMCOR Group, Inc.
| Feb 16, 2012
Gain greater agility and profitability with ArchiCAD BIM software
White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.
| Feb 16, 2012
TLC Engineering for Architecture opens Chattanooga office
TLC Engineering for Architecture provides mechanical, electrical, structural, plumbing, fire protection, communication, technology, LEED, commissioning and energy auditing services.