Matthew Wagner, PE, has joined Ghafari Associates as its Manager of Structural Engineering in Chicago. With over a decade of structural facility design experience, Wagner brings an impressive portfolio of large-scale stadia, healthcare, hospitality, civic and aviation projects to the firm.
Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million. Most recently, he assisted with the expansion of the LSU Tiger Stadium’s South End Zone, which will open for the 2014 college football season.
Wagner also assisted in the design of the main grandstand for the new Circuit of The Americas entertainment complex in Austin, Texas. The $400 million, 3.4-mile racetrack recently hosted the inaugural Formula 1 United States Grand Prix race on November 18. Other major projects include the $1.9 billion Palazzo resort hotel and casino in Las Vegas, the 760,000 square foot San Antonio Military Medical Center and Dallas / Fort Worth International Airport’s Terminal D.
Wagner, an Ohio native, earned a bachelor’s degree in civil engineering from the University of Cincinnati and a master’s degree in civil engineering from the Georgia Institute of Technology. He is a licensed professional engineer and affiliate member of the American Institute of Architects. +
Related Stories
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 9, 2012
2012 Giants 300 survey due Friday, April 13
See how your firm ranks among the AEC industry leaders.
| Mar 7, 2012
Firestone iPad app offers touch technology
Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.
| Mar 7, 2012
LEO A DALY opens new office in Riyadh, Saudi Arabia
Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.