Thornton Tomasetti, the international engineering firm, recently announced that registered architect Richard J. Vivenzio, LEED AP, has joined the firm’s New York office as vice president in the building performance practice. Vivenzio, a licensed architect in New York and New Jersey, has more than 28 years of experience in architectural project management, construction administration, building diagnostic services and forensic investigation.
Having been trained in forensic procedures, Vivenzio has been a designated expert in numerous disputes, representing the plaintiff and defendant, and has testified as an expert in arbitration hearings and depositions. Vivenzio is also an expert in matters of condominium disputes and multi- and single-family housing cases. He has a working knowledge of code interpretation, including International Building Codes, Boca Codes, and ADA Accessibility, as well as zoning and local laws. Vivenzio is well-versed in proper forensic analysis, cause and origin investigations, construction means and methods, and building systems including roofing and exterior building envelope enclosures.
Prior to joining Thornton Tomasetti, Vivenzio was an assistant director of architecture at Chester, Ploussas, Lisowsky Partnership LLC in Matawan, N.J., where he was a project manager on numerous residential projects, adult communities, retail centers and office buildings. He is a member many professional organizations including the Shore Builders Association of New Jersey, New Jersey Builders Association Green Building Committee, New Jersey builders Association Code Committee, and the International Code Council. Vivenzio is a graduate of the University of Southern Mississippi in Hattiesburg with a bachelor’s degree in architectural engineering technology. He has completed a training course in forensic procedures from the Investigative Engineering Association in Ft. Lauderdale, Fla. BD+C
Related Stories
| Apr 3, 2014
Security, accountability, and cloud access: Can you really have it all?
I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally.
| Apr 2, 2014
The new model of healthcare facility management
A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.
| Apr 1, 2014
The risks of mismatched fire-rated assemblies
Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team.
| Apr 1, 2014
Planned global commerce center breaks ground near Phoenix
When completed, PhoenixMart will be one of the largest single-level trade centers in the U.S.
| Apr 1, 2014
Paints, coatings and sealants: Choosing products and procedures for best performance
This course covers life cycle assessment, color selection, emissions, durability, resilience, corrosion resistance, specification standards, and other critical aspects of choosing coatings for interior and exterior walls, ceilings, and roofs.
| Mar 31, 2014
Extreme conversion: Soaring Canadian church transformed into contemporary library
Even before the St. Denys-du-Plateau Church was converted into a library, it was an unusual building, with a towering nave designed to mimic a huge tent inflated by the wind.
| Mar 31, 2014
Tips for creating a competitive bid using codes and loads
Landing a project feels like winning a prize, sort of like finding that forgotten $20 bill in the pocket of a pair of jeans you haven’t worn in a while. But living on the “chance” of winning a job isn’t a great way to pay your electric bill. So, how do you swing the chances in your favor?
Sponsored | | Mar 30, 2014
Ontario Leisure Centre stays ahead of the curve with channel glass
The new Bradford West Gwillimbury Leisure Centre features a 1,400-sf serpentine channel glass wall that delivers dramatic visual appeal for its residents.