The plans for Chaoyang Park Plaza were floated two years ago by MAD architects, and now the design is taking shape.
Located in Beijing's central business district, the massive development was designed with its surroundings in mind, meant to illustrate the relationship between architecture and the natural environment, DesignBoom reports.
Chaoyang Park Plaza is one of Beijing's largest green spaces, and the plaza is locate at the edge. Containing 120,000 square meters of commercial, residential, and office buildings, the plaza is envisioned as a modern, urban forest.
Visitors will have the feeling of moving through a forest, based on the spatial organization of the plaza.
The focal point of the new development will be a pair of asymmetrical towers, covered with ridges and valleys, as a partially eroded mountain.
The ridges are actually a part of an advanced ventilation and filtration system that pulls air inside. These towers are connected by a 17-meter tall lobby. A rooftop garden will top the lobby.
All renderings courtesy of MAD architects.
Related Stories
| Nov 16, 2011
Architecture Billings Index moves upward
The Architecture Billings Index climbed nearly three points in October.
| Nov 16, 2011
CRSI recommends return to inch-pound markings
The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014.
| Nov 16, 2011
John Patelski joins Ghafari as executive vice president
As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.