The plans for Chaoyang Park Plaza were floated two years ago by MAD architects, and now the design is taking shape.
Located in Beijing's central business district, the massive development was designed with its surroundings in mind, meant to illustrate the relationship between architecture and the natural environment, DesignBoom reports.
Chaoyang Park Plaza is one of Beijing's largest green spaces, and the plaza is locate at the edge. Containing 120,000 square meters of commercial, residential, and office buildings, the plaza is envisioned as a modern, urban forest.
Visitors will have the feeling of moving through a forest, based on the spatial organization of the plaza.
The focal point of the new development will be a pair of asymmetrical towers, covered with ridges and valleys, as a partially eroded mountain.
The ridges are actually a part of an advanced ventilation and filtration system that pulls air inside. These towers are connected by a 17-meter tall lobby. A rooftop garden will top the lobby.
All renderings courtesy of MAD architects.
Related Stories
| Mar 7, 2012
LEO A DALY opens new office in Riyadh, Saudi Arabia
Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.
| Mar 7, 2012
Turner appointed Batson-Cook CFO and treasurer
Cecil G. Hood to continue in advisory role.
| Mar 7, 2012
Thornton Tomasetti names Dowdall VP of Kansas City office
Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Mar 7, 2012
Houlihan Lokey adds Steffen to Industrials Group
Steffen bolsters group with experience in the building materials and rorest product sectors.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago
Construction was completed by Skender in just 12 weeks.
| Mar 6, 2012
BLT Architects promotes two to associate
Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.