flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mancini Duffy Bill Mandara on expanding through diversification

Architects

Mancini Duffy Bill Mandara on expanding through diversification

Mancini Duffy's CEO and Co-owner William Mandara talk about his firm's recent growth, which includes an acquisition and new HQs office.


August 11, 2022

In this segment for HorizonTV, BD+C's John Caulfield interviews Mancini Duffy's CEO and Co-owner William Mandara about his firm's recent growth, which includes an acquisition and new HQs office.

Topics discussed:

  • What prompted Mancini Duffy to open a third office in Red Bank, N.J., and how did the pandemic of the past two years shape how that office has been set up and staffed?
  • Your company also expanded in May by acquiring Gertler & Wentz Architects, a New York-based firm. What attracted Mancini Duffy to that firm, and what did they bring to the party?
  • That acquisition coincided with your firm moving into a new headquarters on Eighth Avenue, at a time when other companies have been walking away from office space.  Please provide details about the new office, in terms of size, employee capacity, etc. It is my understanding as well that you tripled the size of your Design Lab — please elaborate.
  • Mancini Duffy was on the design-build team for TSX Broadway, a $2.5 billion 550,000-sf mixed-use building that included lifting the Palace Theater 30 feet, or six stories, above street level, and creating a new entertainment location within New York’s Times Square. Talk about the clients’ vision, and why such a complex design and engineering maneuver was necessary.
  • Your portfolio includes Peloton’s first real headquarters, on West 25th Street, as well as several high-profile building repositions, such as 888 Broadway. What were the clients’ design goals, and what were these projects’ challenges and noteworthy features?
  • What’s next for Mancini Duffy? Do you see the firm expanding outside of the New York metro area? Are there other practices you are considering? What roadblocks will the firm need to navigate for successful growth?  How id diversity, equity, and inclusion factoring into your plans?

Related Stories

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

| Dec 10, 2011

Turning Balconies Outside In

Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures. 

| Dec 10, 2011

BIM tools to make your project easier to manage

Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.

| Dec 9, 2011

BEST AEC FIRM 2011: MHTN Architects

Serving Utah for nearly eight decades.

| Dec 9, 2011

BEST AEC FIRM 2011: HMC Architects

Fostering a tradition of collaboration.

| Dec 9, 2011

BEST AEC FIRM 2011: Gensler

Developing talent on a global scale.

| Dec 9, 2011

BEST AEC FIRM 2011: Chapman Construction/Design

Taking sustainable practices to heart.

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â