In this segment for HorizonTV, BD+C's John Caulfield interviews Mancini Duffy's CEO and Co-owner William Mandara about his firm's recent growth, which includes an acquisition and new HQs office.
Topics discussed:
- What prompted Mancini Duffy to open a third office in Red Bank, N.J., and how did the pandemic of the past two years shape how that office has been set up and staffed?
- Your company also expanded in May by acquiring Gertler & Wentz Architects, a New York-based firm. What attracted Mancini Duffy to that firm, and what did they bring to the party?
- That acquisition coincided with your firm moving into a new headquarters on Eighth Avenue, at a time when other companies have been walking away from office space. Please provide details about the new office, in terms of size, employee capacity, etc. It is my understanding as well that you tripled the size of your Design Lab — please elaborate.
- Mancini Duffy was on the design-build team for TSX Broadway, a $2.5 billion 550,000-sf mixed-use building that included lifting the Palace Theater 30 feet, or six stories, above street level, and creating a new entertainment location within New York’s Times Square. Talk about the clients’ vision, and why such a complex design and engineering maneuver was necessary.
- Your portfolio includes Peloton’s first real headquarters, on West 25th Street, as well as several high-profile building repositions, such as 888 Broadway. What were the clients’ design goals, and what were these projects’ challenges and noteworthy features?
- What’s next for Mancini Duffy? Do you see the firm expanding outside of the New York metro area? Are there other practices you are considering? What roadblocks will the firm need to navigate for successful growth? How id diversity, equity, and inclusion factoring into your plans?
Related Stories
| Apr 19, 2013
Is LED lighting keeping its promises?
Lighting experts debate the benefits, drawbacks, and issues related to specifying LED fixtures.
| Apr 19, 2013
Must see: Shell of gutted church on stilts, 40 feet off the ground
Construction crews are going to extremes to save the ornate brick façade of the Provo (Utah) Tabernacle temple, which was ravaged by a fire in December 2010.
| Apr 18, 2013
Survey seeks info from managers of high-tech facilities
The International Institute for Sustainable Laboratories (I2SL), and Laney College in Oakland California, a National Science Foundation-funded Building Efficiency for a Sustainable Tomorrow (BEST) Center, are collaborating to identify education and training needs and strategies for high-tech facility operators.
| Apr 18, 2013
SOM, CASE team up to launch crowd-sourced apps library
SOM and CASE have formally launched AEC-APPS, the first crowd-sourced, web-based library for applications used by architects, engineers and construction professionals. This is a one-of-a-kind initiative in the AEC Industry and is a non-profit online community that allows digital tool users and toolmakers to share ideas, tips and resources.
| Apr 18, 2013
Calatrava projects encounter issues with water, structure, Guardian says
A dozen years after Calatrava built the spectacular Ysios winery in the rainy Alava region of northern Spain, the building's dramatic, undulating roof continues to let in the damp.
| Apr 17, 2013
Frank Lloyd Wright's Park Avenue showroom demolished
New York loses another architectural gem by Frank Lloyd Wright as new owner razes auto showroom.
| Apr 17, 2013
First look: Renzo Piano's glass-domed motion pictures museum
The Academy of Motion Picture Arts and Sciences last week released preliminary plans for its $300 million Academy of Motion Picture Arts and Sciences museum in Los Angeles, designed by Renzo Piano and local architect Zoltan Pali.
| Apr 16, 2013
5 projects that profited from insulated metal panels
From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.
| Apr 16, 2013
AIA/NCARB survey shows rosier picture for emerging professionals
In 2010, the AIA/NCARB Internship and Career Survey of emerging professionals took a snapshot of young designers during a time ofintense economic contraction, when they were often the first to suffer. But in the two years since, emerging professionals have begun experiencing a rebound.