flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Verizon Media’s new office and broadcast production studio

Office Buildings

Verizon Media’s new office and broadcast production studio

Perkins+Will and Kostow Greenwood Architects designed the project.


By David Malone, Managing Editor | July 27, 2021
Verizon broadcast production studio reception area
Verizon broadcast production studio reception area

Verizon Media, a division of Verizon Communications that houses digital brands like Yahoo, TechCrunch, and HuffPost, has recently received a new workspace and broadcast production studio. The goal of the project was to create a facility that could foster connection and collaboration across brands.

The 21,700-sf facility includes a reception desk, work and waiting lounges, three studios, three control rooms with audio booths, one master control room, one broadcast equipment room, 12 edit rooms, one audio suite, and six breakout/huddle rooms.

 

Verizon broadcast production studio interior

 

The new reception hub serves as the main reception for Verizon Media offices. It is a destination for both staff and visitors and connects with open lounges for working and waiting. The reception area includes sight lines into Control Room 1 and Master Control and a branded media wall that can display a variety of programming.

The new broadcast production studio provides a physical platform where all brands can produce media content. Multiple studios, control rooms, and plug-and-play locations provide flexible shooting opportunities and respond to different production needs. Control Room 1 and Control Room 3 are used for daily, eight-hour live Yahoo! Finance broadcasts and ancillary shoots. Control Room 2 is a general-purpose studio for other company brands.

 

Verizon broadcast production studio control room

 

Studio A was a priority for preservation due to its column-free space and being acoustically isolated to high broadcast standards. Studio B was the site of an existing glass studio. The glass partitions were removed and reused at other locations. Studio B was then enclosed with new solid, acoustic partitions.

Control Rooms 1 and 3 were new construction and were planned to accommodate a high number of positions with some room for additional seating. These rooms also include in-room audio booths to maximize production workflow.

 

Verizon broadcast production studio broadcast room

 

In order to support the consolidation of production from other facility locations, this location required an increase and expansion of the infrastructure. A new rack room was constructed in the existing location. This helped to reduce costs by maintaining critical existing pathways but allowed an increase in size and an upgrade in equipment and HVAC system. A new cable tray network was also installed throughout the broadcast area.

Perkins+Will served as led project designers and architect of record with Kostow Greenwood Architects as the broadcast studio design architects. L&K Partners was the contractor and Syska Hennessy Group was the MEP/FP engineer.

Related Stories

Reconstruction & Renovation | Jul 18, 2017

Mortenson Construction incorporates 100-year-old barn into new Portland office space

Mortenson deconstructed the barn and repurposed it for the new space.

Office Buildings | Jul 12, 2017

CetraRuddy unveils seven-story office building design for Staten Island’s Corporate Park

Corporate Commons Three is expected to break ground later this summer.

Sustainability | Jul 10, 2017

British Columbia receives its first WELL certified workplace courtesy of Perkins + Will

Over 100 wellness features are incorporated into CBRE’s Vancouver office.

Office Buildings | Jul 5, 2017

Do open offices work?

Whether for a team of 20 or 200, if today’s professionals are not currently working in an open office environment, a change is likely on the horizon.

Office Buildings | Jun 27, 2017

Bloomberg’s European headquarters wants to become a natural extension of London

Foster + Partners’ design rises 10 stories and is composed of two connected buildings.

Office Buildings | Jun 20, 2017

Mattress company’s new ‘BEDQuarters’ definitely won’t put employees to sleep

The HQ is packed with amenities and features to keep team members happy and engaged at work.

Building Team Awards | Jun 14, 2017

A space for all: Lighthouse for the Blind and Visually Impaired

Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.

Office Buildings | Jun 13, 2017

WeWork takes on a construction management app provider

Fieldlens helps turn jobsites into social networks. 

Building Team Awards | Jun 12, 2017

Texas technopark: TechnipFMC John T. Gremp Campus

Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.

Office Buildings | Jun 12, 2017

At 11.8 million-sf, LG Science Park is the largest new corporate research campus in the world

The project is currently 75% complete and on schedule to open in 2018.

boombox1
boombox2
native1

More In Category


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021