flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Vegas rebound: Genting Group acquires assets of stalled Vegas casino-resort

Vegas rebound: Genting Group acquires assets of stalled Vegas casino-resort

Will build $2 billion hotel-casino development


By BD+C Staff | March 7, 2013
Vegas rebound: Genting Group acquires assets of stalled Vegas casino-resort
Vegas rebound: Genting Group acquires assets of stalled Vegas casino-resort

International hospitality giant Genting Group has announced a deal with Boyd Gaming Corp. to purchase the land and assets, including partially built structures, of the stalled Echelon casino-resort in Las Vegas. The company will pay Boyd $350 million for the 87-acre property, according to the Las Vegas Review-Journal.

Genting, which owns and operates properties in Malaysia, Singapore, and New York City, is planning to build a $2 billion hotel-casino development, called Resorts World Las Vegas, that will feature 3,500 rooms, a 175,000-sf casino, convention space, and some 200,000 sf of retail and restaurants. 

The plan includes completing many of the partially built structures on the site, including hotel structures and a parking garage. It's expected to open in 2016.

The development is the second major Las Vegas construction announcement in the past month. In last February, SLS Hotels broke ground on a $415 million makeover of the Sahara Hotel, which closed in 2011 after nearly 60 years on the Strip.

Related Stories

| May 14, 2012

Plumbing research coalition to study drainline transport issue

The effort is aimed at determining if decreasing levels of water flow­­––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 14, 2012

SMPS and Deltek announce alliance

A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.

| May 14, 2012

ArchiCAD e-Specs integration unveiled

Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021