flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Vancouver, B.C., may delay new zero emissions building standards

Codes and Standards

Vancouver, B.C., may delay new zero emissions building standards

Building permit delays may postpone new standards by a year.


By Peter Fabris, Contributing Editor | June 21, 2021

Vancouver, B.C., may delay net-zero construction requirements for a year due to concerns over building permit delays.

The city is beset by a housing affordability crisis and the new rules would worsen the issue. City staff has recommended delaying the regulations to speed up residential permits and reduce the growth of the permitting backlog.

Industry groups including Homebuilders Association Vancouver and the Canadian Institute of Plumbing and Heating have urged the city to enact the delay. A representative from the homebuilders group said the permitting backlog in the city has reached crisis proportions and that the zero emissions requirement adds 12 weeks to the process.

A PassiveHouse advocate argued against the delay, saying that the industry needs a strong incentive to make progress on green construction.

Related Stories

| Sep 18, 2013

New AISC design guide on structural stainless steel now available

For the first time in the U.S., design professionals now have an authoritative resource on structural stainless steel with AISC Steel Design Guide No. 27, Structural Stainless Steel.

| Sep 18, 2013

DBIA’s ‘Design-Build Done Right’ best practices project seeks industry input

The Design-Build Institute of America (DBIA) is seeking industry input on its project to create a design-build best practices document.

| Sep 11, 2013

USGBC Florida Chapter survey to help contractors adopt sustainable practices

Contractors in Florida could benefit from a data collection project by the state's chapter of the U.S. Green Building Council.

| Sep 11, 2013

Disability, vet hiring standards for contractors are goals, not quotas

Contractors that fall short of new federal hiring rules concerning veterans and disabled persons will not necessarily incur penalties, says Patricia Shiu, director of the Office of Federal Contract Compliance Programs.

| Sep 11, 2013

Sports stadium accidents suggest code updates may be necessary to prevent falls

Since 2000, at least three individuals have died as a result of falling from the upper decks of stadiums in the United States. In addition, eight non-fatal falls have occurred in stadiums and arenas over that time.

| Sep 11, 2013

White paper examines Joint Commission requirements for NFPA codes in healthcare

The healthcare industry has experienced great attention from The Joint Commission concerning fire and life safety issues.

| Sep 11, 2013

San Francisco expected to drop firefighter air tank refilling station rule for skyscrapers

San Francisco is poised to drop a requirement that skyscrapers have refill stations so firefighters can recharge their air tanks during a blaze. The city has required that new high-rises have the air refill systems for about ten years. 

| Sep 5, 2013

State legislatures continue to raise the bar on green school construction

Since the beginning of 2013, the USGBC has followed more than 125 bills across 34 states that seek to advance healthy, high-performing schools.

| Sep 5, 2013

Construction industry groups create coalition to respond to new OSHA silica rule

A group of 11 construction trade associations has created the Construction Industry Safety Coalition in response to the Occupational Safety and Health Administration’s (OSHA) proposed rule on silica for the construction industry.

| Sep 5, 2013

Red tape delays California county jail construction projects

California authorized $1.2 billion for jail construction in 2007, but not a single county in the state has completed a jail project since then.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021