flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Vacant Dartmouth College building to become faculty and graduate student center

University Buildings

Vacant Dartmouth College building to become faculty and graduate student center

Leers Weinzapfel Associates designed the project.


By David Malone, Associate Editor | November 26, 2018
Dana Hall renovation and reconstruction

Rendering courtesy Leers Weinzapfel Associates

The vacant Dana Hall library building on Dartmouth College’s north campus was a 32,995-sf, 1960s building that became the anchor of the school’s north campus renewal plan. The building is being reimagined as a faculty and graduate student center.

Designed by Leers Weinzapfel Associates, the new building aspires for net zero energy use and will include new entrances for its surrounding buildings, a wide pedestrian bridge, and new circulation between buildings. The hope is the reimagined building will better connect the north campus to the green and main campus.

 

Dana Hall renovation orojectRendering courtesy Leers Weinzapfel Associates.

See Also: Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

 

An unused laboratory adjacent to Dana Hall will be demolished and an addition will be built in its place that houses the new building’s lobby and a cafe with a terrace overlooking a nearby green space. The renovated building’s upper floors will contain collegial faculty offices, classrooms, and places for student gathering. A penthouse level includes a solar paneled canopy and a south-facing planted terrace. In the basement there is a walk-out graduate student lounge that opens to a protected courtyard below a pedestrian bridge.

 

Dana Hall renovation projectRendering courtesy Leers Weinzapfel Associates.

 

Among the renovated buildings sustainability features are high R value terracotta-clad walls, solar panel canopy triple glazed windows, and south-facing glass with an expanded metal interlayer to limit summer sun. Before construction began, Dana Hall was stripped down to its concrete columns and slabs to remove existing hazardous materials.

The building is currently under construction and is slated to open for the 2020 Winter Term.

Related Stories

Higher Education | Jun 7, 2017

Building for the future: Five trends in higher education projects

Preparing students for life after graduation has become the primary motivator behind construction initiatives at U.S. colleges and universities.

University Buildings | May 5, 2017

'Escape forward': How one public university plans to grow

How can public institutions expect to survive and thrive in Illinois' turbulent environment? The answer, for one school anyways, is to think and act like entrepreneurs.

University Buildings | Apr 28, 2017

Suburban Chicago college breaks ground on aviation-themed student center

The design of the center is meant to pay tribute to the university’s heritage in aviation and aeronautics.

University Buildings | Apr 26, 2017

UMass Amherst is home to America’s first CLT academic building

The building brings the architecture, landscape architecture, and building technology departments under one roof.

Sponsored | Ceilings | Apr 17, 2017

University of Toronto Scarborough Campus building meets aesthetic, performance and sustainability goals with Rockfon ceiling systems

The University of Toronto’s $52.5 million, 126,788-square-foot Environmental Science & Chemistry Building is the newest addition to the Scarborough campus in Toronto, Ontario, Canada.

Products and Materials | Mar 28, 2017

Mondopads highlight Portland State University’s new Decision Theater

A total of seven InFocus Mondopads were used in the room to accommodate large group work and individual study.

University Buildings | Mar 14, 2017

Fresh off NCAA national title, Clemson opens plush football operations complex

The 142,500-sf facility, which opened just three weeks after Clemson’s national championship win over the University of Alabama, adjoins the indoor practice facility and outdoor practice fields, consolidating football operations into one complex.

University Buildings | Mar 8, 2017

Massive mixed-use residential village on USC’s Los Angeles campus on schedule to open this fall

Prefabrication of the six buildings’ walls reduced construction time by a year. 

School Construction | Feb 26, 2017

A new survey finds education construction activity going strong this year

Surveys of school districts and colleges, though, raise questions about financing for future projects.  

University Buildings | Jan 10, 2017

UMass Amherst’s Isenberg School of Business to receive modern, twisted addition from BIG

The 70,000-sf building was developed in collaboration with Boston-based Goody Clancy.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021