flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Vacant Dartmouth College building to become faculty and graduate student center

University Buildings

Vacant Dartmouth College building to become faculty and graduate student center

Leers Weinzapfel Associates designed the project.


By David Malone, Associate Editor | November 26, 2018
Dana Hall renovation and reconstruction

Rendering courtesy Leers Weinzapfel Associates

The vacant Dana Hall library building on Dartmouth College’s north campus was a 32,995-sf, 1960s building that became the anchor of the school’s north campus renewal plan. The building is being reimagined as a faculty and graduate student center.

Designed by Leers Weinzapfel Associates, the new building aspires for net zero energy use and will include new entrances for its surrounding buildings, a wide pedestrian bridge, and new circulation between buildings. The hope is the reimagined building will better connect the north campus to the green and main campus.

 

Dana Hall renovation orojectRendering courtesy Leers Weinzapfel Associates.

See Also: Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

 

An unused laboratory adjacent to Dana Hall will be demolished and an addition will be built in its place that houses the new building’s lobby and a cafe with a terrace overlooking a nearby green space. The renovated building’s upper floors will contain collegial faculty offices, classrooms, and places for student gathering. A penthouse level includes a solar paneled canopy and a south-facing planted terrace. In the basement there is a walk-out graduate student lounge that opens to a protected courtyard below a pedestrian bridge.

 

Dana Hall renovation projectRendering courtesy Leers Weinzapfel Associates.

 

Among the renovated buildings sustainability features are high R value terracotta-clad walls, solar panel canopy triple glazed windows, and south-facing glass with an expanded metal interlayer to limit summer sun. Before construction began, Dana Hall was stripped down to its concrete columns and slabs to remove existing hazardous materials.

The building is currently under construction and is slated to open for the 2020 Winter Term.

Related Stories

University Buildings | Sep 2, 2020

University of North Carolina Charlotte Academic Complex completes

Woolpert provided design and engineering upgrades for the project.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

University Buildings | Aug 27, 2020

Eight strategies for achieving successful P3 development models

Transparency and communication are imperative, says new white paper on these agreements.

University Buildings | Aug 20, 2020

Student housing in the COVID-19 era

Student housing remains a vital part of the student and campus experience.

University Buildings | Aug 3, 2020

5 reasons universities are renovating student housing

Clark Nexsen’s Student Life practice leader, Peter Aranyi, discusses the benefits of renovation and why it offers particular value to campuses nationwide.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021