flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Utilities should do more to give building owners energy use information

Multifamily Housing

Utilities should do more to give building owners energy use information

Owners of multi-tenant buildings lack basic information.


By Peter Fabris, Contributing Editor | October 2, 2015

Even when a building has smart meters, the owner cannot get total kilowatt hour use from the utility. Photo: Portland General Electric/Creative Commons

Utilities should do a better job of giving multi-tenant building owners better information about energy use, writes Philip Henderson of the National Resources Defense Council.

Most utilities do not provide basic information about thousands of buildings occupied by multiple tenants with separate utility accounts. This applies to apartments, shopping malls, and offices.

The owner needs to know total kilowatt hours of electricity used in the building to assess energy improvement projects. “Giving the owner a ‘whole-building’ total means the owner does not have to read meters manually or collect paper bills from tenants -- time-consuming, error-prone, and unnecessary,” Henderson writes. Even when a building has smart meters, the owner cannot get total kilowatt hour use from the utility. 

Several leading utilities, such as Commonwealth Edison in Chicago, PEPCO in Washington, D.C., Eversource in Boston, National Grid in New York, and Consolidated Edison in New York, have recently made this information available. Some have created online portals for building owners to obtain summary information.

Related Stories

Multifamily Housing | Nov 4, 2015

Labor City: The Qatari complex for 70,000 migrant workers opens

The project is just one of seven house complexes built by the government for the country’s approximately 260,000 labor migrants.

Architects | Oct 27, 2015

Top 10 tile trends for 2016

Supersized tile and 3D walls are among the trending tile design themes seen at Cersaie, an exhibition of ceramic tile and bathroom furnishings held in Bologna, Italy in October.

Multifamily Housing | Oct 27, 2015

Multifamily building in downtown Montreal is being built from the roof down

The method eliminates the need for scaffolding and cranes.

Modular Building | Oct 22, 2015

My Micro NY will soon be New York's first micro-apartment building

The Manhattan modular building will be completed in December and will contain apartments with low rents, but small space.

Architects | Oct 20, 2015

Four building material innovations from the Chicago Architecture Biennial

From lightweight wooden pallets to the largest lengths of CLT-slabs that can be shipped across North America

Multifamily Housing | Oct 20, 2015

Builder confidence rises on multifamily’s strength

Starts and completions were up solidly in September, but permits are leveling off. 

Multifamily Housing | Oct 16, 2015

Textile factory turned multifamily has train tracks running through it

The Counting House Lofts is a 200-year-old building that still has its train tracks, exterior train bay doors, and a watch house tower.

Multifamily Housing | Oct 15, 2015

Montreal apartment is world’s largest residential cross-laminated timber project

 Its 434 condo, townhouse, and rental units in three eight-story buildings are made from sustainably harvested wood turned into panels by Canadian company Nordic Wood Structures together with the Cree Nation in Chibougamau.

Sponsored | Multifamily Housing | Oct 15, 2015

Apartment takes progressive turn in architecturally traditional D.C.

The new Lyric 440K Apartments is a 14-story structure housing 234 one- and two-bedroom units in the heart of D.C.'s up-and-coming Mount Vernon Triangle

Multifamily Housing | Oct 12, 2015

Freddie Mac: Multifamily demand should outpace supply through 2016

Vacancy rates and rent growth are “converging” in most markets.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021