Utah became the latest state to update its commercial building energy efficiency code from the 2015 International Energy Conservation Code (IECC) to the 2018 IECC in July.
The new code permits the use of the ASHRAE/IES 90.1-2016 standard, giving building owners and design teams an alternative compliance path. Any plans submitted for permitting on or after July 1 are required to follow 2018 IECC new energy code requirements.
The new code provides for improved building envelope performance and reduced air infiltration. Another change is a requirement for occupancy sensor controls for lighting shut off within open plan offices.
The occupancy sensor control shut off time delay was reduced to 20 minutes from 30 minutes. Open plan offices must limit the size of the occupancy sensor-controlled area to separate 600 square-foot zones. When occupancy is not detected in these zones, general lighting must automatically shut off or be reduced by at least 80%.
Related Stories
AEC Tech | Jun 17, 2016
Driverless cars could soon start impacting commercial, retail project design
Offsite parking and more space for valet parking lines are among the foreseeable changes.
Codes and Standards | Jun 17, 2016
Bay State moves toward single BIM protocol on state projects
Massport’s guidelines a step forward for integrated BIM initiative.
Multifamily Housing | Jun 14, 2016
San Francisco voters approve tougher affordability requirement on new housing development
Critics charge that the measure may backfire and actually reduce new affordable units.
Concrete | Jun 13, 2016
American Concrete Institute releases new Guide to Shotcrete
Includes information on application procedures, testing.
Healthcare Facilities | Jun 10, 2016
Top 10 health technology hazards include some influenced by space design
ECRI Institute’s annual list includes operational and workflow issues.
Codes and Standards | Jun 9, 2016
Supreme Court ruling could aid developers on properties containing wetlands
Unanimous decision allows landowners to take regulatory decisions straight to court.
Green | Jun 8, 2016
TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1
The newly renovated 25,000-sf space achieved gold-level status.
Concrete | Jun 7, 2016
Concrete Institute publishes document providing concrete curing guidance
New curing monitoring techniques included.
Energy | Jun 7, 2016
Energy modeling payback typically as short as one to two months
Energy modeling is a ‘no-brainer—like checking MPG on a car’
Green | Jun 2, 2016
USGBC offers new LEED pilot credit: Building Material Human Hazard and Exposure Assessment
For assessing human health-related exposure scenarios for construction products.