The U.S. Green Building Council released the results of its Supply Chain Optimization Working Group. The group that was chartered to develop implementation procedures within option 3 of the LEED v4 Materials & Resources credit (Building Disclosure and Optimization - Material Ingredients).
The group has recommended significant implementation actions to supplement option 3, intended to provide building product manufacturers with a step-by-step process for meeting its requirements. The working group also created a framework for a field test of the guidance with building product manufacturers. Product manufacturers interested in testing the new option 3 guidance are encouraged to register now.
The working group has outlined minimum steps for product manufacturers that enable them to offer insight and transparency into their processes:
- Publicize guiding principles that include commitments to continual improvement, sharing of information, green chemistry, and green engineering.
- Implement an ISO-14001-type environmental management system, with added elements for human health and safety that addresses all significant environmental and health impacts of their operations.
- Ensure that any direct suppliers of hazardous ingredients have corresponding environmental and health and safety management systems.
There are added incentives for companies that go above and beyond the minimum in situations where, for example, they apply the processes to their entire company or full supply chain.
Related Stories
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 26, 2012
Milwaukee U-Haul facility receives LEED-CI Silver
The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.
| Feb 22, 2012
Siemens earns LEED certification for Maryland office
The Beltsville facility, which also earned the ENERGY STAR Label for energy performance, implemented a range of energy efficiency, water conservation and sustainable operations measures as part of the certification process.
| Feb 22, 2012
Suffolk awarded Boston post office renovation project
Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.
| Feb 20, 2012
Comment period for update to USGBC's LEED Green Building Program now open
This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.
| Feb 17, 2012
Tremco Inc. headquarters achieves LEED Gold certification
Changes were so extensive that the certification is for new construction and not for renovation; officially, the building is LEED-NC.
| Feb 15, 2012
Code allowance offers retailers and commercial building owners increased energy savings and reduced construction costs
Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects.
| Feb 8, 2012
World’s tallest solar PV-installation
The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.
| Jan 31, 2012
Chapman Construction/Design: ‘Sustainability is part of everything we do’
Chapman Construction/Design builds a working culture around sustainability—for its clients, and for its employees.
| Jan 19, 2012
LEED puts the 'Gold' in Riverside golden arches
McDonald's restaurant recognized for significant energy savings.