flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

USGBC pushes back LEED v4 deadline

USGBC pushes back LEED v4 deadline

LEED 2009 is extended through October 2016


By Peter Fabris, Contributing Editor | October 30, 2014

The U.S. Green Building Council will allow LEED users to register projects under the LEED 2009 rating system until Oct. 31, 2016. The original date for LEED 2009 registration to close was June 15, 2015.

Extending to October 2016 gives LEED users and members of the green building industry additional time to prepare for LEED v4, the latest version of LEED, which features increased rigor and multiple updates, USGBC says.

“When USGBC launched LEED v4 last year, we set out with one goal in mind – to raise the bar in a way that challenges the building industry to reach higher than ever before,” said Rick Fedrizzi, CEO & founding chair, USGBC. “However, the market has requested additional time to prepare for LEED v4, so we are responding.”

In a survey conducted at the 2014 Greenbuild conference, 61% of respondents said they are “not ready” or “unsure” if they are ready to pursue LEED v4 and require additional time to prepare. LEED v4 has been in the market for nearly one year and will remain available for those who are ready.

(http://us5.campaign-archive2.com/?u=ca55cb2e5c853bc823c1f59af&id=2e9f211184&e=e4f9394553)

Related Stories

| May 10, 2012

Industry groups urge Congress to leave contracting decisions to agencies

An organization of several industry groups urged Congress to leave many contracting decisions to the discretion of individual agencies by avoiding blanket mandates.

| May 10, 2012

OSHA proposes new rule to have employers find and fix hazards

The Occupational Safety and Health Administration has proposed a new regulation, Injury and Illness Prevention Program, or I2P2, which would compel employers to find and fix safety hazards.

| May 3, 2012

Stay current on green codes at AGC Environmental Conference

Keep abreast of market trends such as 2012 changes to green standards and codes at the AGC Contractors Environmental Conference, June 7-8, 2012 in Arlington, Va.

| May 3, 2012

OSHA reduces fines in Cincinnati casino collapse

The Occupational Safety and Health Administration has reduced the number of violations from four to two against four firms it cited earlier this month in the collapse of a casino under construction in Cincinnati.

| May 3, 2012

New York City implements controversial crane licensing requirements

New York City officials announced strict new licensing and testing requirements for all crane operators in New York City to raise safety standards.

| May 3, 2012

Green-roof requirement now includes industrial facilities in Toronto

A mandate that requires installation of green roofs on new commercial and residential buildings in Toronto has been expanded to include industrial facilities.

| May 3, 2012

Innovative wastewater treatment helps achieve LEED rating

LEED for New Construction, Neighborhood Development and the LEED Volume Program offer some ways to achieve LEED points when dealing with wastewater treatment.

| Apr 26, 2012

Lack of bolts on steel support caused collapse at Cincinnati casino

Too few bolts connecting horizontal steel support beams with vertical steel columns was the cause of January’s construction accident at Horseshoe Casino Cincinnati, according to the report of the Occupational Safety and Health Administration.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021