The U.S. Green Building Council (USGBC) has introduced a new pilot credit in the LEED green building rating system called “Safety First: Cleaning and Disinfecting Your Space.”
The credit is intended to support building owners and operators as they respond to the COVID-19 pandemic. It provides guidance on effectively cleaning and disinfecting buildings using green cleaning best practices.
These are intended to reduce levels of chemical, biological, and particulate contaminants in buildings that can compromise air quality, human health, building finishes, and systems. Building managers must create a policy and implement practices that focus on a healthy indoor environment and worker safety to earn the credit.
Other requirements include:
· Describe the approach, including a timeline outlining when new cleaning practices were put in place for COVID-19, along with a copy of the green cleaning policy or program.
· Prepare a list of cleaning products and materials used or purchased to clean the facility, noting which are and are not compliant with green cleaning criteria.
· Utilize cleaning equipment that has ergonomic design features to reduce worker injuries due to vibration, noise, and user fatigue.
· Identify “high-touch points” along with frequencies for cleaning and disinfecting them.
Related Stories
| Jul 12, 2012
New York’s One Bryant Park Bank of America tower is first new high-rise to achieve LEED Platinum
The new One Bryant Park Bank of America tower in midtown Manhattan is the first new commercial high-rise to achieve LEED Platinum certification.
| Jul 12, 2012
OSHA launches campaign to prevent heat illness
The Occupational Safety and Health Administration has launched its 2012 Heat Illness Prevention Campaign to educate employees and their employers about the hazards of working outdoors in heat, and how to prevent heat-related illnesses.
| Jul 12, 2012
Contractors have increasing concerns over new federal hiring quotas
A proposed rule by the U.S. Department of Labor's Office of Federal Contract Compliance Programs to increase disabled- and veteran-worker hiring quotas for federal contractors continues to raise deep concerns among contractors.
| Jul 5, 2012
Veterans Administration threatens to pull contract on new Orlando medical center
The Veterans Administration asked contractor Brasfield & Gorrie to get more workers on the job and figure out a way to get the job done faster, or the VA would pull the contract on the much-delayed Orlando VA Medical Center.
| Jul 5, 2012
Cost to contractors for new federal hiring quotas much higher than estimated, AGC says
Administration officials significantly underestimated the cost to construction employers of proposed new hiring quotas for federal contractors, according to analysis by the Associated General Contractors of America.
| Jul 5, 2012
Roof membrane could have prevented roof parking deck collapse, specialist says
The collapse of a section of a roof parking deck at the Algo Centre Mall in Elliot Lake in Ontario, Canada could have been prevented if the structure had a membrane, according to a concrete expert and specialist in structure analysis at McMaster University.
| Jul 5, 2012
New Joplin, Mo. hospital being built to withstand tornado that destroyed predecessor
After the May 22, 2011, EF-5 tornado destroyed St. John’s Regional Medical Center in Joplin, Mo., architects and engineers analyzed how the nine-story structure reacted to the storm.
| Jul 5, 2012
Continued tax breaks necessary for widespread adoption of net zero buildings
Tax breaks passed by the U.S. government to encourage construction of green buildings are set to expire in 2012 and 2013.