flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

USC selects Hathaway Dinwiddie and AECOM to mange L.A. Memorial Coliseum renovations

Reconstruction & Renovation

USC selects Hathaway Dinwiddie and AECOM to mange L.A. Memorial Coliseum renovations

The iconic stadium opened in 1923.


By David Malone, Associate Editor | February 1, 2018
The Memorial Coliseum's Peristyle

Photo: Wikimedia Commons

The Los Angeles Memorial Coliseum, located in Exposition Park adjacent to the University of Southern California campus, is currently undergoing renovations meant to protect its landmark status and greatly improve the fan experience.

A joint venture of Hathaway Dinwiddie and AECOM will manage the project. Renovations on the 93,607-seat Coliseum will include the restoration of the Coliseum peristyle; all new seats with increased legroom; new box suites and lounges; a new press box; upgraded concourses; new concession stands, state-of-the-art audio, video, and WiFi technology; and the replacement of mechanical, electrical, and plumbing systems to meet current standards.

In addition to the renovations and beginning in August 2019, the Coliseum will be officially renamed the United Airlines Memorial Coliseum. The partnership with the airline was critical to funding the $270 million renovation project.

Originally opening in 1923, the stadium’s tenants have included the UCLA Bruins, the Los Angeles Dodgers, and the Summer Olympics, which it has hosted twice in 1932 and 1984.

The renovations, which are being designed by DLR Group, are scheduled for completion in time for the 2019 USC Trojans football season.

To follow along with the Coliseum’s renovations via live images and updated time-lapse videos, click here.

Related Stories

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Populous selected to design 'crystalline skin' stadium for 2014 Winter Olympics

Russian officials have selected global architect Populous to design the main stadium for the 2014 Winter Olympic and Paralympic Games in Sochi, Russia. The 40,000-seat stadium will feature a crystalline skin that "engages with its surroundings by day and provides an iconic representation of the color and spectacle of the games when illuminated at night," said Populous senior principal John Barrow.

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

Clark Group, Mortenson among nation's busiest state/local government contractors, according to BD+C's Giants 300 report

A ranking of the Top 40 State/Local Government Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit /giants

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

| Aug 11, 2010

Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report

A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Gensler among eight teams named finalists in 'classroom of the future' design competition

Eight teams were recognized today as finalists of the 2009 Open Architecture Challenge: Classroom. Finalists submitted designs ranging from an outdoor classroom for children in inner-city Chicago, learning spaces for the children of salt pan workers in India, safe spaces for youth in Bogota, Colombia and a bamboo classroom in the Himalayan mountains.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021