flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A U.S. startup is working with Dubai to advance 3D printing for construction

Building Technology

A U.S. startup is working with Dubai to advance 3D printing for construction

Cazza Construction Technologies is building a crane that it claims can layer more than 2,000 sf of concrete per day.


By John Caulfield, Senior Editor | January 24, 2017

Last year, Dubai completed the world's first fully functional 3-D printed office. Dubai wants 25% of its buildings to use 3D printing technology by 2030, and is working with U.S.-based Cazza Construction Technologies, which is building a 3D crane apparatus for larger projects. Image: Government of UEA

 

Last April, Dubai unveiled its 3D Printing Strategy, which calls for 25% of buildings in that city to be constructed using 3D printing technology by 2030. That strategy focuses on three major sectors: construction, medical products, and consumer products. The use of 3D printing in Dubai’s construction sector will increase by 2% starting in 2019.

One month after the strategy was publicized, Dubai completed what it asserts is the world’s first 3D-printed office, a 250-sm (2,691-sf) building made from a mixture of cement and other building materials, and assembled in 17 days by a 3D printer measuring 20 feet high, 120 feet long, and 40 feet wide, with a automated robotic arm.

Can a 3D-printed city be too far behind? The answer might lie in the Minitank, a 3D-printing crane under construction that its developer, a Silicon Valley startup called Cazza Construction Technologies, says can layer 2,153 sf of concrete per day, which would make it 50% faster than conventional construction methods.

Cazza’s 19-year-old CEO and co-founder Chris Kelsey tells CNN that construction is the natural progression for 3D printing. Last year, the Dubai Road and Transport Authority invited Cazza to present its technology to government officials overseeing the 3D Printing Strategy initiative. “Out of all of the groups they’d seen online or spoken with, they were most fascinated with the capabilities of our unique machines,” Kelsey told ConstructionWeekOnline.com.

It remains to be seen, though, whether this technology is practical for large-scale projects. There’s not much information about Cazza’s origins or its technology on its website, nor any images of the Minitank. (The site, however, is opening soliciting for partners and distributors for its technology.)  Previously, Kelsey founded a company called Appsitude, an app development company. Part of Cazza’s funding came from proceeds of Appsitude’s sale last year.

Cazza, though, is undeniably following in the footsteps of pioneers who have tested the limits of 3D printing for construction. These include Behrokh Khoshnevis, a professor at the University of Southern California, who invented a concrete-extruding 3D printer in 2009 that could print a 2,500-sf structure in 20 hours; the construction firm WinSun, which in 2014 3D printed 10 one-story houses in a single day; and DUS Architects, which last year 3D printed a full canal house in Amsterdam.

Cazza’s process is relatively straightforward: an architect would upload blueprints onto a computer system, which transmits the information to the crane printer that layers the concrete in the shape of the design.

The Minitank, if it becomes operational, will be able to print on-site, and construct buildings up to three stories high. “The barrier to companies [printing on-site] so far has been that it’s extremely difficult to develop a machine with all of the factors needed,” Kelsey explained.

The Minitank would use cement made from 80% recycled materials. Cazza claims that its portable equipment can be set up within 30 minutes, and that its process would reduce labor and materials costs by up to 90%. Fernando De Los Rios, Cazza’s COO, said his company would soon bring its engineers from across the world to start working in Dubai and surrounding areas.

Dubai’s Roads and Transport Authority has several 3D printed projects in the works already, including the Museum of the Future, and DEWA’s labs in the Mohammed Bin Rashid Al-Maktoum Solar Park. 

Related Stories

Building Technology | Apr 21, 2017

AIA selects 2016 Upjohn Research Initiative Projects

Grants awarded to initiatives that study various aspects of design within the built environment.

Building Technology | Mar 9, 2017

Prefabrication's predicament: It's much harder than it looks

Many of the nation’s largest contractors, including Gilbane, Mortensen, Skanska, and Turner, have been utilizing prefab techniques on select projects for a decade or more.

Great Solutions | Mar 8, 2017

Pop-out balcony is a breath of fresh air for stuffy hotel rooms and apartments

In less than one minute, Bloomframe transforms from an insulated picture window to an open balcony.

Building Materials | Feb 15, 2017

New metamaterial cools roofs without any energy consumption

The material is barely thicker than aluminum foil and can be economically manufactured for large-scale residential and commercial applications.

Building Technology | Feb 13, 2017

Denver’s ‘smart neighborhood’ will be packed with futuristic technology

The neighborhood will become a test lab for innovative technology.

Virtual Reality | Feb 1, 2017

Tour ancient buildings and cities as they were when new with Lithodomos VR

An Australian archeological startup is bringing the ancient world to a VR headset near you.

Building Technology | Jan 30, 2017

Machine learning could help buildings notify occupants about critical systems failures before they happen

Data from sensors built into HVAC units paired with a machine learning algorithm predicted 76 out of 124 real faults for an Italian hospital.

Building Technology | Jan 27, 2017

The driverless clinic: How buildings powered by AI can help promote wellness and enhance human connections

In the future, we envision that the smart technology in our phones will be embedded in the items we wear and the objects we use.

Energy Efficiency | Jan 5, 2017

Exponential growth in net zero energy buildings predicted for the next two decades

Technology and regulations will be the drivers, says Navigant Research.

Concrete Technology | Dec 5, 2016

Telescopic walls could help combat the damages of floodwaters

The project is currently under development by a Ph.D. candidate at the University of Buffalo.

boombox1
boombox2
native1

More In Category




Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021