Last year, construction spending in New York City was up 26%, to $36 billion. And construction employment in the Big Apple, at 122,975, was the highest it’s been since 2008, according to the New York Building Congress. Of that dollar total, spending on nonresidential construction increased by 20% to $9.8 billion, the first time since 2010 that nonresidential spending grew year-to-year.
Those heady numbers, though, are no guarantees of future spending. In fact, New York is among the major metros—including Washington D.C., Phoenix, and San Diego—where office building development and construction are tailing off from historic levels or cooling down, according to CoStar, the real estate market research firm, in its report on the national office market trends for the first quarter of 2015.
The good news is that an estimated 108 million sf of office space were under construction in the U.S. at the end of the first quarter, a 17% gain over the same period a year ago. That construction level approached the historical average of 122 million sf, which the country last achieved in late 2008.
The cautionary news is that 15 million sf of office space were delivered in the first quarter of 2015, the first time in the latest economic cycle that deliveries exceeded net absorptions, which during that quarter were 12 million sf.
CoStar estimates that construction levels are above historic norms in about one-third of the largest U.S. metros. It singles out Silicon Valley in Northern California, which is seeing a rash of corporate campuses springing up. Other above-average office construction markets include Dallas-Fort Worth, Raleigh, Boston, and Chicago.
The researcher cites a shift in strategy among office building developers such as Boston Properties, which is using capital from the sale of older for new developments with potentially higher yields. Boston Properties has 11 office projects totaling 3.3 million sf in its current development pipeline.
CoStar notes that while rising rents are driving the office construction booms in certain markets like San Francisco, two thirds of the country’s metros are still not seeing the kind of rent appreciation that would justify large-scale new office construction.
That being said, among the notable deliveries in the first quarter was the 1.5-million-sf second phase of ExxonMobil’s corporate campus in Houston, which is also where a 1.7-million-sf campus that is fully leased to FMC Technologies got started during the quarter.
Lincoln Property started the first new office building in San Francisco’s Financial District in a decade, a 433,000-sf project that, despite being built on spec, shouldn’t have too much trouble finding tenants in a market whose office vacancy rate for four- and five-star buildings is 7.8%.
Related Stories
| Apr 11, 2014
ULI report documents business case for building healthy projects
Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.
| Apr 11, 2014
First look: KPF's designs for DreamWorks in the massive Shanghai DreamCenter
Two blocks of offices will be centerpiece of new cultural and lifestyle district in the West Bund Media Port.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 31, 2014
Removable flood prevention system installed in one of New York City's largest office buildings
EKO Flood Protection created a flood prevention solution for one of New York City's largest office buildings, 55 Water Street, that can be put up in 8 hours by a crew of 30 people.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 25, 2014
World's tallest towers: Adrian Smith, Gordon Gill discuss designing Burj Khalifa, Kingdom Tower
The design duo discusses the founding of Adrian Smith + Gordon Gill Architects and the design of the next world's tallest, Kingdom Tower, which will top the Burj Khalifa by as much as a kilometer.
| Mar 24, 2014
Frank Lloyd Wright's S.C. Johnson Research Tower to open to the public—32 years after closing
The 14-story tower, one of only two Wright-designed high-rises to be built, has been off limits to the public since its construction in 1950.
| Mar 21, 2014
Forget wood skyscrapers - Check out these stunning bamboo high-rise concepts [slideshow]
The Singapore Bamboo Skyscraper competition invited design teams to explore the possibilities of using bamboo as the dominant material in a high-rise project for the Singapore skyline.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.