flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. hotel construction pipeline full, fueled by upscale property segment

Hotel Facilities

U.S. hotel construction pipeline full, fueled by upscale property segment

The 506,000 rooms under contract in April represent a 14.6% YoY increase. 


By STR | May 17, 2016
U.S. hotel construction pipeline full, led by upscale property segment

Photo: Pixabay

STR’s April 2016 Pipeline Report shows 506,000 rooms in 4,125 projects under contract in the U.S. The total represents a 14.6% increase in the number of rooms under contract compared with April 2015.

Under contract data includes projects in the construction, final planning, and planning stages, but does not include projects in the unconfirmed stage.

In the construction stage, the U.S. reported 161,014 rooms in 1,241 projects, a 28.3% increase in year-over-year comparisons.

Among the Chain Scale segments, Upscale (55,994 rooms in 407 hotels) accounted for the most rooms in construction, followed by Upper Midscale (52,934 rooms in 523 hotels).

“The Upscale and Upper Midscale segments combine to represent more than 67% of total construction activity in the U.S., with almost 109,000 rooms between the two,” said Bobby Bowers, STR’s Senior VP for Operations. “Looking further down the road, these two segments combine for almost 207,000 rooms in the two planning phases. That means these segments will likely continue to experience significant supply increases over the next few years. It will be very interesting to monitor the effect on select-service occupancy.”

The Economy segment reported the least contract and construction activity but the largest year-over-year increases in rooms under contract (+41.2% to 4,731 rooms) and in construction (+94.8% to 1,276 rooms).

“The increase in activity is coming across the board,” Bowers said.

Every segment with the exception of Luxury (+7.9%) reported a double-digit increase in construction activity when compared with last April. Every segment outside of Unaffiliated (+2.4%) reported a double-digit lift in under contract.  

Related Stories

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

Design Innovation Report | Jun 25, 2019

2019 Design Innovation Report: Super labs, dream cabins, office boardwalks, façades as art

9 projects that push the limits of architectural design, space planning, and material innovation.

Hotel Facilities | May 16, 2019

JFK’s TWA Flight Center has been reimagined as a hotel

MCR and Morse Development spearheaded the project.

Hotel Facilities | Apr 23, 2019

citizenM Union Square to break ground in San Francisco this week

It will be the first citizenM hotel in California.

Hotel Facilities | Apr 10, 2019

Hilton’s ‘canopy’ lifestyle brand hotel opens in Minneapolis’ Mill District

The project involved converting a 1904 industrial building.

Hotel Facilities | Mar 20, 2019

Denver hotel features garage doors in guest rooms

GKKworks designed the building.

Hotel Facilities | Feb 5, 2019

CambridgeSeven named lead architect for new Cambria Hotel

The hotel will be located in Somerville, Mass.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021