flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. hotel construction pipeline continues its year-over-year growth

Codes and Standards

U.S. hotel construction pipeline continues its year-over-year growth

In its eighth consecutive quarter of growth, projects currently under construction stand at 1,729 projects/235,278 rooms.


By Lodging Econometrics | November 11, 2019

Courtesy Pixabay

In its fall report, buoyed by a steady consumer-driven economy, analysts at Lodging Econometrics (LE) reported that the total U.S. construction pipeline stood at 5,704 projects/700,496 rooms, up 6% by projects and 8% by rooms year-over-year (YOY). Pipeline totals continue to climb closer to the all-time high of 5,883 projects/785,547 rooms reached in the second quarter of 2008, and are just 179 projects shy.

In its eighth consecutive quarter of growth, projects currently under construction stand at 1,729 projects/235,278 rooms, the highest count recorded since the second quarter of 2008. Projects scheduled to start construction in the next 12 months, currently 44% of all pipeline projects, was 2,479 projects/286,125 rooms, very close to the all-time high set in 2009. It’s up a whopping 16% in projects and 13% in rooms, YOY. Projects in the early planning stage stand at 1,496 projects/179,093 rooms.

But as a result of declines in commercial investment brought about by the indecision caused by the global slowdown and the prolonged tariff imbroglio, this is the second quarter in a row where construction starts have declined, an indicator that pipelines growth may top out in late 2020/2021.

Through the end of the third quarter, 704 new hotels with 81,111 rooms opened across the U.S. with another 299 projects/33,059 rooms expected to open by year-end. New hotel openings in the LE forecast for 2020 stand at 1,112 new hotels/122,702 rooms followed by 1,126 new hotels/130,447 rooms scheduled to open in 2021.

This quarter is the first time this cycle where supply growth at 2% has risen and drawn even with demand growth which has fallen to 2%. In 2019, 16 of the top 25 markets show occupancy declines YOY while 11 markets show RevPAR declines. 

Related Stories

Codes and Standards | Dec 16, 2021

Property owners need systematic approach to GHG emissions reduction

Energy hog buildings at risk for becoming stranded assets.

Codes and Standards | Dec 15, 2021

Design problems now the primary cause of construction claims and disputes

More likely to occur due to more tight timescales imposed upon third parties engaged in design.

Codes and Standards | Dec 13, 2021

ABC releases guide to technology for improving safety performance

Provides details on how to identify, choose, and implement technology.

Codes and Standards | Dec 8, 2021

Construction industry is the top target for cyberattacks

Smart building tech is a new avenue for criminals.

Codes and Standards | Dec 8, 2021

Proposals to add more multifamily to Atlanta prompt drive for Buckhead to secede

City aims to increase housing as projections point to sharp population increase.

Codes and Standards | Dec 7, 2021

Design problems now the primary cause of construction claims and disputes

More likely to occur due to more tight timescales imposed upon third parties engaged in design.

Codes and Standards | Dec 5, 2021

New standard for Phase I environmental reports requires more research work on many sites

Update affects around 250,000 commercial real estate transactions a year.

Codes and Standards | Nov 30, 2021

Dept. of Energy publishes RFP for technical assistance on supporting better building codes

Addresses advanced standards to reduce energy consumption and GHG emissions.

Codes and Standards | Nov 29, 2021

FAA seeking design of air traffic control towers of the future

Call for design submissions for safe, efficient structures.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021