flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. hotel construction up 9% in the first quarter of 2023, led by Marriott and Hilton

Hotel Facilities

U.S. hotel construction up 9% in the first quarter of 2023, led by Marriott and Hilton

More than 5,500 projects are in the works across the U.S., according to new data from Lodging Econometrics.


By Lodging Econometrics | May 2, 2023
Photo by Jonathan Kemper on Unsplash

Photo by Jonathan Kemper on Unsplash

In the latest United States Construction Pipeline Trend Report from Lodging Econometrics (LE), analysts report that hotel construction pipeline projects in the U.S. continue to increase, standing at 5,545 projects/658,207 rooms at the close of Q1 2023. Up 9% by both projects and rooms year-over-year (YOY); project totals at Q1 ‘23 are just 338 projects, or 5.7%, behind the all-time high of 5,883 projects recorded in Q2 2008.

At the close of the first quarter, projects currently under construction stand at 1,051 projects/140,365 rooms, each showing 9% growth YOY. Projects scheduled to start construction in the next 12 months are at 2,060 projects/241,568 rooms, each up 8% YOY. 

Projects in the early planning stage account for 44% of the projects in the total U.S. construction pipeline at Q1. Early planning projects increased 10% YOY, setting an all-time high of 2,434 projects/276,274 rooms.

This is the fourth consecutive quarter of total pipeline growth for the U.S., which can be, in part, attributed to the robust recovery of travel demand. Increased consumer confidence and spending activity has fueled strong occupancy and rate growth throughout the last twelve months as well. 

Developers are motivated to sign new projects anticipating more favorable financing conditions in the coming quarters. Owners are eager to wrap up existing brand conversion and renovation projects, which have been a substantial focus for many quarters now.

The U.S. hotel construction pipeline is expected to grow modestly or just incrementally through 2023. There are no growth spikes expected this year. The pipeline is back loaded, meaning there is ample opportunity for vendors/suppliers in the industry, and third party management companies.

At the Q1 close, sixty-two percent of projects in the total pipeline are concentrated within the upscale and upper midscale chain scales. These two chain scales continue to dominate the pipeline and that is not expected to change anytime soon.

Renovation and brand conversion activity in the U.S. continues to boom in early 2023, reaching record project counts of 1,953 hotels/253,533 rooms, for a 38% YOY increase by projects and a 37% YOY increase by rooms. LE expects renovation and conversion activity to continue into 2023 as owners spend to bring their hotels into alignment with current brand standards or look elsewhere for new brand identification.

A total of 103 new hotels/11,762 rooms opened in the U.S. in the first quarter. For the remainder of the year, LE forecasts another 493 new hotel projects/59,355 rooms to open, representing a combined 1.3% supply growth rate in 2023. LE analysts expect the upward growth in new hotel openings to continue with an additional 699 new hotel projects/81,574 rooms anticipated to open in 2024, for a 1.4% supply increase.

Marriott, Hilton, IHG Continue to Dominate the U.S. Hotel Construction Pipeline

Marriott International (Marriott) tops the charts with the greatest number of projects in the U.S. hotel construction pipeline, at Q1 2023, with 1,499 projects/181,377 rooms, followed closely by Hilton Worldwide (Hilton), with a record-high count of 1,436 projects/161,359 rooms, and then InterContinental Hotels Group (IHG) with 809 projects/80,679 rooms. Combined, these three franchise companies comprise 68% of the projects in the total U.S. pipeline.

Marriott also has the most projects and room counts in each stage of the pipeline at Q1, with 279 projects/38,156 rooms currently under construction, 763 projects/90,038 rooms scheduled to start construction in the next 12 months, and 457 projects/53,183 rooms in early planning.

The leading brands by project count for the three companies with the largest pipelines in the U.S. at Q1 are Home2 Suites by Hilton with all-time highs by projects and rooms of 546 projects/56,001 rooms, Marriott’s TownePlace Suites, also reaching all-time highs by projects and rooms at Q1, with 333 projects/31,068 rooms, and IHG’s Holiday Inn Express brand with 301 projects/28,371 rooms. These three brands collectively represent 21% of the projects in the total U.S. hotel construction pipeline at the close of Q1 2023.

LE recorded record-high conversion pipeline totals of 1,079 projects/110,084 rooms for the U.S. in the first quarter of 2023. Of these conversion totals, Hilton had the most conversion projects and room totals ever recorded by LE with 105 projects/14,456 rooms, similarly, Marriott had a record 100 conversion projects, accounting for 13,465 rooms, and IHG had 52 conversion projects/6,2543 rooms. These three franchise companies account for 31% of all the rooms in the conversion pipeline across the country.

The franchise companies with the greatest number of new project announcements in the first quarter were: Hilton with 110 projects/11,790 rooms, Marriott with 61 projects/6,730 rooms, and IHG with 33 projects/3,103 rooms. These companies represent 60% of all new projects announced in the U.S. in Q1 2023.

In Q1 2023, Marriott opened 33 new hotels with 3,711 rooms. Hilton opened 24 new hotels with 2,781 rooms, and IHG opened 6 new hotels with 629 rooms. The LE forecast for new hotel openings in 2023 anticipates that Marriott will open a total of 152 new hotel projects/19,064 rooms by year-end, Hilton is forecasted to open 141 new hotel projects/16,980 rooms in 2023, and IHG is expected to open 88 new hotel projects/9,975 rooms. These three franchise companies collectively account for 64% and 65%, respectively, of new hotel projects and rooms forecast to open in 2023.

Related Stories

Reconstruction & Renovation | Mar 30, 2017

Waldorf Astoria New York to undergo massive renovation

Skidmore, Owings & Merrill and Pierre-Yves Rochon prepared the designs for what will be one of the most complex and intensive landmark preservation efforts in New York City history.

Hotel Facilities | Mar 14, 2017

Hotels are becoming the favored places for retailers and consumer products to bolster their brands

Several high-profile names have launched hospitality divisions, often with well-established management partners.

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Hotel Facilities | Feb 20, 2017

The future of hotel design: Human-centered

Change is inevitable and it impacts on everything, not least on the way we design.

Market Data | Feb 16, 2017

How does your hospital stack up? Grumman/Butkus Associates 2016 Hospital Benchmarking Survey

Report examines electricity, fossil fuel, water/sewer, and carbon footprint.

Hotel Facilities | Feb 15, 2017

Morphosis redesigns Swiss hotel rooms as custom ‘aesthetic experiences’

The redesigned rooms focused on scale, color, tactility, unexpected form, and connections to the natural context.

Hotel Facilities | Jan 30, 2017

New renderings of the 1966 Century Plaza Hotel’s redevelopment

The redevelopment project got underway last summer and is expected to be completed in 2018.

Hotel Facilities | Jan 25, 2017

New Denver hotel will integrate historic 130-year-old fire station into its design

The 1883 Denver Hose Company No.1 building will be fully restored as part of the project.

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021