flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

As the U.S. economy sputters back to life, contractors wait for the green light on projects [2013 Giants 300 Report]

As the U.S. economy sputters back to life, contractors wait for the green light on projects [2013 Giants 300 Report]

There are enough positive indictors in the economy to justify greenlighting projects, but building owners and developers remain reluctant to pull the trigger. 


By David Barista, Editor-in-Chief | July 16, 2013
Completed in March 2012, the sleek office and prototype facility for global defe
Completed in March 2012, the sleek office and prototype facility for global defense contractor BAE Systems consolidates the companys operations in Sterling Heights, Mich. Walbridge was general contractor on the project, which involved building a 55,000-sf prototype center with 20 bays for vehicle and subsystem testing, and a 164,000-sf office structure to accommodate 600 employees. SmithGroupJJR was the AE firm on the project, providing architectural, structural, mechanical, and electrical services. PHOTO: COURTESY WALBRIDGE AND SMITHGROUPJJR
The narrative of the U.S. nonresidential construction industry of the last 12 months has been one of growth, but in all the wrong places. While five of the 16 major construction sectors grew last year—some significantly—those that experienced the largest gains represent a relatively small portion of the overall market. On the flip side, several sectors that saw the steepest decline last year happen to make up a fairly sizable portion of nonresidential construction.
 
Lodging, for example, has been on a tear in recent months, growing 16.6% between April 2012 and April 2013 in order to meet the increase in business and leisure travel. Double-digit YOY growth is good news any way you look at it, but the fact that lodging represents just 2% of the overall market means it will do little to move the needle. Same goes for the transportation (11.4% growth), commercial (1.9%), and office (1.6%) sectors: their growth is muted by their relatively small size.
 
On the other hand, major sectors like education, power, and highway and street all saw a drop in construction spending last year.
 
“As a result, when you look at the aggregate, we’re not seeing much of a recovery in nonresidential construction spending,” said Anirban Basu, Chief Economist with the Associated Builders and Contractors (ABC) and Chairman and CEO with Sage Policy Group, during his recent mid-year construction forecast. 

TOP CONTRACTORS

 
2012 Total Revenue ($)
1 Turner Corporation, The $9,084,870,000
2 Fluor $4,268,290,500
3 Skanska USA $4,076,092,814
4 PCL Construction Enterprises $3,981,419,164
5 Whiting-Turner Contracting Co., The $3,699,782,771
6 Clark Group $3,563,246,719
7 Balfour Beatty $3,453,790,847
8 Gilbane $3,083,529,000
9 Structure Tone $2,947,433,000
10 McCarthy Holdings $2,546,000,000
 

TOP CONSTRUCTION MANAGEMENT FIRMS

 
2012 Total Revenue ($)
1 URS Corp. $297,282,076
2 STV $227,390,000
3 JE Dunn Construction $207,304,154
4 Barton Malow $182,697,897
5 Parsons Brinckerhoff $179,900,000
6 S. M. Wilson & Co. $168,859,740
7 Turner Corporation, The $157,920,000
8 Jones Lang LaSalle $140,020,000
9 LPCiminelli $139,198,329
10 Structure Tone $132,000,000
“What we’re seeing is a real dichotomy in the market. There is evidence of private-sector improvement in the data, but we also see strong evidence of constrained public-sector budgets affecting major markets like education and public safety,” he says.  
 
Basu predicted a 5-6% bump in total nonresidential construction spending in 2013, with the bulk of the gains coming from the commercial and industrial sectors. “It’s not terrible news, but given how far nonresidential activity had fallen, this is a really slow rebound at best,” he added.
 
Adding to the frustration of AEC firms, said Basu, is the reluctance of many building owners and developers to pull the trigger on new construction and renovation projects. He said there are enough positive indictors in the U.S. economy to justify greenlighting projects: 2% GDP growth this year, even with the sequestration measures taking hold; falling unemployment numbers; positive consumer spending and household wealth figures; an upturn in housing construction; near-historic-low interest rates; shrinking office and industrial vacancy rates; healthy hotel occupancy rates; and budget surpluses in some states.
 
“All of this suggests we should be in the midst of a fairly robust nonresidential construction recovery, but it’s simply not taking place,” said Basu, offering some possible explanations: uncertainty related to the Affordable Care Act; an investor community that remains largely skittish; slow population growth; troubled state and local government budgets; public pension concerns; high unemployment rates; European Union budget woes; and the overall rise in healthcare costs.
 
This mixed bag of positive and negative economic data translates into a gradual recovery for the nonresidential construction market.
 

Read BD+C's full Giants 300 Report

Related Stories

| Apr 9, 2013

FMI predicts 8% rise in construction put in place for 2013

FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels. 

| Apr 8, 2013

Most daylight harvesting schemes fall short of performance goals, says study

Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.

| Apr 6, 2013

Lord, Aeck & Sargent and Urban Collage merge

In a move that brings full-service planning expertise to its already well-established architecture practice, Lord, Aeck & Sargent (LAS) has merged with Urban Collage (UC), one of the largest urban and campus planning and design firms in the Southeast. Combining these firms’ talents was made official today. UC plans to retain its name for the foreseeable future.

| Apr 6, 2013

First look: GlaxoSmithKline's double LEED Platinum office

GlaxoSmithKline and Liberty Property Trust/Synterra Partners transform the work environment with the opening of Five Crescent Drive

| Apr 5, 2013

Bangkok gets a leaning tower, that may topple

A seven-story apartment tower under construction in Bangkok has started to tilt and is on the verge of toppling.

| Apr 5, 2013

Snøhetta design creates groundbreaking high-tech library for NCSU

The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space.

| Apr 5, 2013

'My BIM journey' – 6 lessons from a BIM/VDC expert

Gensler's Jared Krieger offers important tips and advice for managing complex BIM/VDC-driven projects.

| Apr 5, 2013

Commercial greenhouse will top new Whole Foods store in Brooklyn

Whole Foods and partner Gotham Greens will create a 20,000-sf greenhouse atop one of the retailer's Brooklyn supermarkets. Expected to open this fall, the facility will supply produce to nine Whole Foods stores in metro New York City.

| Apr 5, 2013

Projected cost for Apple's Campus 2 balloons to $5 billion

Campus 2, Apple Inc.'s proposed ring-shaped office facility in Cupertino, Calif., could cost $5 billion to build, according to a report by Bloomberg.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Empty mall to be converted to UCLA Research Park

UCLA recently acquired a former mall that it will convert into the UCLA Research Park that will house the California Institute for Immunology and Immunotherapy at UCLA and the UCLA Center for Quantum Science and Engineering, as well as programs across other disciplines. The 700,000-sf property, formerly the Westside Pavilion shopping mall, is two miles from the university’s main Westwood campus. Google, which previously leased part of the property, helped enable and support UCLA’s acquisition.


Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021