flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

As the U.S. economy sputters back to life, contractors wait for the green light on projects [2013 Giants 300 Report]

As the U.S. economy sputters back to life, contractors wait for the green light on projects [2013 Giants 300 Report]

There are enough positive indictors in the economy to justify greenlighting projects, but building owners and developers remain reluctant to pull the trigger. 


By David Barista, Editor-in-Chief | July 16, 2013
Completed in March 2012, the sleek office and prototype facility for global defe
Completed in March 2012, the sleek office and prototype facility for global defense contractor BAE Systems consolidates the companys operations in Sterling Heights, Mich. Walbridge was general contractor on the project, which involved building a 55,000-sf prototype center with 20 bays for vehicle and subsystem testing, and a 164,000-sf office structure to accommodate 600 employees. SmithGroupJJR was the AE firm on the project, providing architectural, structural, mechanical, and electrical services. PHOTO: COURTESY WALBRIDGE AND SMITHGROUPJJR
The narrative of the U.S. nonresidential construction industry of the last 12 months has been one of growth, but in all the wrong places. While five of the 16 major construction sectors grew last year—some significantly—those that experienced the largest gains represent a relatively small portion of the overall market. On the flip side, several sectors that saw the steepest decline last year happen to make up a fairly sizable portion of nonresidential construction.
 
Lodging, for example, has been on a tear in recent months, growing 16.6% between April 2012 and April 2013 in order to meet the increase in business and leisure travel. Double-digit YOY growth is good news any way you look at it, but the fact that lodging represents just 2% of the overall market means it will do little to move the needle. Same goes for the transportation (11.4% growth), commercial (1.9%), and office (1.6%) sectors: their growth is muted by their relatively small size.
 
On the other hand, major sectors like education, power, and highway and street all saw a drop in construction spending last year.
 
“As a result, when you look at the aggregate, we’re not seeing much of a recovery in nonresidential construction spending,” said Anirban Basu, Chief Economist with the Associated Builders and Contractors (ABC) and Chairman and CEO with Sage Policy Group, during his recent mid-year construction forecast. 

TOP CONTRACTORS

 
2012 Total Revenue ($)
1 Turner Corporation, The $9,084,870,000
2 Fluor $4,268,290,500
3 Skanska USA $4,076,092,814
4 PCL Construction Enterprises $3,981,419,164
5 Whiting-Turner Contracting Co., The $3,699,782,771
6 Clark Group $3,563,246,719
7 Balfour Beatty $3,453,790,847
8 Gilbane $3,083,529,000
9 Structure Tone $2,947,433,000
10 McCarthy Holdings $2,546,000,000
 

TOP CONSTRUCTION MANAGEMENT FIRMS

 
2012 Total Revenue ($)
1 URS Corp. $297,282,076
2 STV $227,390,000
3 JE Dunn Construction $207,304,154
4 Barton Malow $182,697,897
5 Parsons Brinckerhoff $179,900,000
6 S. M. Wilson & Co. $168,859,740
7 Turner Corporation, The $157,920,000
8 Jones Lang LaSalle $140,020,000
9 LPCiminelli $139,198,329
10 Structure Tone $132,000,000
“What we’re seeing is a real dichotomy in the market. There is evidence of private-sector improvement in the data, but we also see strong evidence of constrained public-sector budgets affecting major markets like education and public safety,” he says.  
 
Basu predicted a 5-6% bump in total nonresidential construction spending in 2013, with the bulk of the gains coming from the commercial and industrial sectors. “It’s not terrible news, but given how far nonresidential activity had fallen, this is a really slow rebound at best,” he added.
 
Adding to the frustration of AEC firms, said Basu, is the reluctance of many building owners and developers to pull the trigger on new construction and renovation projects. He said there are enough positive indictors in the U.S. economy to justify greenlighting projects: 2% GDP growth this year, even with the sequestration measures taking hold; falling unemployment numbers; positive consumer spending and household wealth figures; an upturn in housing construction; near-historic-low interest rates; shrinking office and industrial vacancy rates; healthy hotel occupancy rates; and budget surpluses in some states.
 
“All of this suggests we should be in the midst of a fairly robust nonresidential construction recovery, but it’s simply not taking place,” said Basu, offering some possible explanations: uncertainty related to the Affordable Care Act; an investor community that remains largely skittish; slow population growth; troubled state and local government budgets; public pension concerns; high unemployment rates; European Union budget woes; and the overall rise in healthcare costs.
 
This mixed bag of positive and negative economic data translates into a gradual recovery for the nonresidential construction market.
 

Read BD+C's full Giants 300 Report

Related Stories

| Jun 6, 2014

KPF, Kevin Roche unveil design for 51-story Hudson Yards tower in NYC [slideshow]

Related Companies and Oxford Properties Group are teaming to develop Fifty Five Hudson Yards, the latest addition to the commercial office tower collection in the 28-acre Hudson Yards development—the largest private real estate development in the history of the U.S.

| Jun 6, 2014

Shipping container ship terminal completed in Spain

In Seville, Spain, architectural firms Hombre de Piedra and Buró4 have designed and completed a cruise ship terminal out of used shipping containers.

| Jun 5, 2014

International Parking Institute names best new parking structures

Winners include garages that are architectural delights, an airport's canopied parking atrium, and an environmentally friendly garage under America's oldest park.

| Jun 4, 2014

Emerging trends in healthcare development: neighborhood care, mixed-use models on the rise

In urban and even suburban markets, real estate is about the "live, work, play," with close proximity to mass transit and other amenities, like retail stores. Healthcare organizations are following suit.

| Jun 4, 2014

Want to design a Guggenheim? Foundation launches open competition for proposed Helsinki museum

This is the first time the Guggenheim Foundation has sought a design through an open competition. Anonymous submissions for stage one of the competition are due September 10, 2014.

| Jun 4, 2014

Market update: A difficult first quarter for construction spending comes to an end

This year's unusually difficult winter took its toll on construction activity. Nonetheless, first quarter spending for all the major groups was up compared to the same period in 2013.

| Jun 4, 2014

Construction team named for Atlanta Braves ballpark

A joint venture between Barton Malow, Brasfield & Gorrie, Mortenson Construction, and New South Construction will build the Atlanta Braves ballpark, which is scheduled to open in early 2017. Check out the latest renderings of the plan.

| Jun 3, 2014

Must see: World's tallest LEGO tower built in Budapest

The tower, built in front of St. Stephen's Basilica, is topped with a Rubik's cube and was built using thousands of blocks.

| Jun 3, 2014

Great leadership comes down to one thing

While it’s often said that strong leadership is an organization’s competitive advantage, is there a single characteristic that can predict which leaders will be most effective? SPONSORED CONTENT

| Jun 3, 2014

Libeskind's latest skyscraper breaks ground in the Philippines

The Century Spire, Daniel Libeskind's latest project, has just broken ground in Century City, southwest of Manila. It is meant to accommodate apartments and offices.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021