flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

As the U.S. economy sputters back to life, contractors wait for the green light on projects [2013 Giants 300 Report]

As the U.S. economy sputters back to life, contractors wait for the green light on projects [2013 Giants 300 Report]

There are enough positive indictors in the economy to justify greenlighting projects, but building owners and developers remain reluctant to pull the trigger. 


By David Barista, Editor-in-Chief | July 16, 2013
Completed in March 2012, the sleek office and prototype facility for global defe
Completed in March 2012, the sleek office and prototype facility for global defense contractor BAE Systems consolidates the companys operations in Sterling Heights, Mich. Walbridge was general contractor on the project, which involved building a 55,000-sf prototype center with 20 bays for vehicle and subsystem testing, and a 164,000-sf office structure to accommodate 600 employees. SmithGroupJJR was the AE firm on the project, providing architectural, structural, mechanical, and electrical services. PHOTO: COURTESY WALBRIDGE AND SMITHGROUPJJR
The narrative of the U.S. nonresidential construction industry of the last 12 months has been one of growth, but in all the wrong places. While five of the 16 major construction sectors grew last year—some significantly—those that experienced the largest gains represent a relatively small portion of the overall market. On the flip side, several sectors that saw the steepest decline last year happen to make up a fairly sizable portion of nonresidential construction.
 
Lodging, for example, has been on a tear in recent months, growing 16.6% between April 2012 and April 2013 in order to meet the increase in business and leisure travel. Double-digit YOY growth is good news any way you look at it, but the fact that lodging represents just 2% of the overall market means it will do little to move the needle. Same goes for the transportation (11.4% growth), commercial (1.9%), and office (1.6%) sectors: their growth is muted by their relatively small size.
 
On the other hand, major sectors like education, power, and highway and street all saw a drop in construction spending last year.
 
“As a result, when you look at the aggregate, we’re not seeing much of a recovery in nonresidential construction spending,” said Anirban Basu, Chief Economist with the Associated Builders and Contractors (ABC) and Chairman and CEO with Sage Policy Group, during his recent mid-year construction forecast. 

TOP CONTRACTORS

 
2012 Total Revenue ($)
1 Turner Corporation, The $9,084,870,000
2 Fluor $4,268,290,500
3 Skanska USA $4,076,092,814
4 PCL Construction Enterprises $3,981,419,164
5 Whiting-Turner Contracting Co., The $3,699,782,771
6 Clark Group $3,563,246,719
7 Balfour Beatty $3,453,790,847
8 Gilbane $3,083,529,000
9 Structure Tone $2,947,433,000
10 McCarthy Holdings $2,546,000,000
 

TOP CONSTRUCTION MANAGEMENT FIRMS

 
2012 Total Revenue ($)
1 URS Corp. $297,282,076
2 STV $227,390,000
3 JE Dunn Construction $207,304,154
4 Barton Malow $182,697,897
5 Parsons Brinckerhoff $179,900,000
6 S. M. Wilson & Co. $168,859,740
7 Turner Corporation, The $157,920,000
8 Jones Lang LaSalle $140,020,000
9 LPCiminelli $139,198,329
10 Structure Tone $132,000,000
“What we’re seeing is a real dichotomy in the market. There is evidence of private-sector improvement in the data, but we also see strong evidence of constrained public-sector budgets affecting major markets like education and public safety,” he says.  
 
Basu predicted a 5-6% bump in total nonresidential construction spending in 2013, with the bulk of the gains coming from the commercial and industrial sectors. “It’s not terrible news, but given how far nonresidential activity had fallen, this is a really slow rebound at best,” he added.
 
Adding to the frustration of AEC firms, said Basu, is the reluctance of many building owners and developers to pull the trigger on new construction and renovation projects. He said there are enough positive indictors in the U.S. economy to justify greenlighting projects: 2% GDP growth this year, even with the sequestration measures taking hold; falling unemployment numbers; positive consumer spending and household wealth figures; an upturn in housing construction; near-historic-low interest rates; shrinking office and industrial vacancy rates; healthy hotel occupancy rates; and budget surpluses in some states.
 
“All of this suggests we should be in the midst of a fairly robust nonresidential construction recovery, but it’s simply not taking place,” said Basu, offering some possible explanations: uncertainty related to the Affordable Care Act; an investor community that remains largely skittish; slow population growth; troubled state and local government budgets; public pension concerns; high unemployment rates; European Union budget woes; and the overall rise in healthcare costs.
 
This mixed bag of positive and negative economic data translates into a gradual recovery for the nonresidential construction market.
 

Read BD+C's full Giants 300 Report

Related Stories

| Aug 26, 2014

6 lessons from a true IPD project: George Washington University Hospital

In its latest blog post, Skanska shares tips and takeaways from the firm's second true integrated project delivery project.

| Aug 26, 2014

Ranked: Top industrial sector AEC firms [2014 Giants 300 Report]

Stantec, Jacobs, and Turner top BD+C's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2014 Giants 300 Report.

| Aug 26, 2014

High-rise concept uses 'sky street' to link towers [slideshow]

The design for a new complex in Shenzhen’s bay area consists of highly reflective glass towers, expansive garden space, and a horizontal glass structure that connects the buildings.

| Aug 25, 2014

Restoration of quake-ravaged Atascadero City Hall affirms city’s strength [2014 Reconstruction Awards]

The landmark city hall was severely damaged by the San Simeon earthquake in 2003. Reconstruction renewed the building’s stability, restored its exterior, and improved the functionality of the interior. 

| Aug 25, 2014

Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]

Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.

| Aug 25, 2014

Tall wood buildings: Surveying the early innovators

Timber has been largely abandoned as a structural solution in taller buildings during the last century, in favor of concrete and steel. Perkins+Will's Rebecca Holt writes about the firm's work in surveying the burgeoning tall wood buildings sector.

| Aug 25, 2014

'Vanity space' makes up large percentage of world's tallest buildings [infographic]

Large portions of some skyscrapers are useless space used to artificially enhance their height, according to the Council on Tall Buildings and Urban Habitat.

| Aug 25, 2014

Photographer creates time-lapse video of 1 WTC using 30,000 photos

Choosing from 30,000 photos he took from the day construction began in 2006 to the day when construction was finished in 2012, Brooklyn-based photographer Benjamin Rosamund compressed 1,100 photos to create the two-minute video.

| Aug 25, 2014

Glazing plays key role in reinventing stairway design

Within the architectural community, a movement called "active design" seeks to convert barren and unappealing stairwells originally conceived as emergency contingencies into well-designed architectural focal points. SPONSORED CONTENT

| Aug 25, 2014

An easy trick for minimizing construction delays

About one out of every three construction projects is behind schedule or over budget, according to the Construction Industry Institute's Assessment of Owner Project Management Practices and Performance survey. SPONSORED CONTENT

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021