The U.S. construction pipeline remains robust through the first half of 2020, despite pandemic

Projects currently under construction stand at 1,771 projects/235,467 rooms, up 3% and 1% respectively, YOY.


By Lodging Econometrics | July 27, 2020

Courtesy Pixabay

Analysts at Lodging Econometrics (LE) report that at the close of the second quarter of 2020, the total U.S. hotel construction pipeline stands at 5,582 projects/687,801 rooms, down a mere 1% by projects and rooms, Year-Over-Year (YOY). Remarkably, despite some project cancelations, postponements, and delays, there has been minimal impact on the U.S. construction pipeline. Contrary to what is being experienced with hotel operations, the pipeline remains robust as interest rates are at all-time lows. 

Projects currently under construction stand at 1,771 projects/235,467 rooms, up 3% and 1% respectively, YOY. Projects scheduled to start construction in the next 12 months total 2,389 projects/276,247 rooms. Projects in the early planning stage stand at 1,422 projects/176,087 rooms. As expected, developers with projects under construction are still experiencing some opening delays. However, projects continue to move forward, albeit with extended timelines. As was the case at the end of the first quarter, developers with projects scheduled to start construction in the next 12 months continue to monitor current events and make adjustments to their construction start and opening dates. 

In the first half of 2020, the U.S. opened 313 new hotels with 36,992 rooms. Additionally, there were 481 new projects with 56,823 rooms announced into the pipeline in the first half of 2020. Of those totals, 169 new project announcements with 20,359 rooms occurred in the second quarter. With franchise development staff largely working from home, non-essential travel halted, and with the on-going pandemic, the ability to get a new development deal signed has slowed. This has resulted in a 53% decrease in new project announcements compared to the second quarter of 2019 when 359 projects/44,895 rooms were recorded. 

With the arrival of summer, the country has begun to see an uptick in domestic leisure travel. As a result, more and more hotels are re-opening, and many others have begun to move-up renovation plans and/or are repositioning their property with a brand conversion. In the first half of 2020, LE recorded 1,465 active renovation projects/314,043 rooms and 1,196 active conversion projects/136,110 rooms throughout the United States.

Related Stories

Market Data | Nov 10, 2021

Construction input prices see largest monthly increase since June

Construction input prices are 21.1% higher than in October 2020.

Market Data | Nov 5, 2021

Construction firms add 44,000 jobs in October

Gain occurs even as firms struggle with supply chain challenges.

Market Data | Nov 3, 2021

One-fifth of metro areas lost construction jobs between September 2020 and 2021

Beaumont-Port Arthur, Texas and Sacramento--Roseville--Arden-Arcade Calif. top lists of gainers.

Market Data | Nov 2, 2021

Construction spending slumps in September

A drop in residential work projects adds to ongoing downturn in private and public nonresidential.

Hotel Facilities | Oct 28, 2021

Marriott leads with the largest U.S. hotel construction pipeline at Q3 2021 close

In the third quarter alone, Marriott opened 60 new hotels/7,882 rooms accounting for 30% of all new hotel rooms that opened in the U.S.

Hotel Facilities | Oct 28, 2021

At the end of Q3 2021, Dallas tops the U.S. hotel construction pipeline

The top 25 U.S. markets account for 33% of all pipeline projects and 37% of all rooms in the U.S. hotel construction pipeline.

Market Data | Oct 27, 2021

Only 14 states and D.C. added construction jobs since the pandemic began

Supply problems, lack of infrastructure bill undermine recovery.

Market Data | Oct 26, 2021

U.S. construction pipeline experiences highs and lows in the third quarter

Renovation and conversion pipeline activity remains steady at the end of Q3 ‘21, with conversion projects hitting a cyclical peak, and ending the quarter at 752 projects/79,024 rooms.

Market Data | Oct 19, 2021

Demand for design services continues to increase

The Architecture Billings Index (ABI) score for September was 56.6.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021