flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. construction costs expected to rise 14% year over year by close of 2022

U.S. construction costs expected to rise 14% year over year by close of 2022

CBRE forecast cites inflation, labor shortage, supply chain challenges, Covid-19, and Ukraine.


By Peter Fabris, Contributing Editor | September 8, 2022
Construction Costs
Courtesy Pexels.

Coldwell Banker Richard Ellis (CBRE) is forecasting a 14.1% year-on-year increase in U.S. construction costs by the close of 2022.

It is the largest jump since CBRE began making cost projections in 2007. The firm cited financial pressures such as inflation, labor shortages, supply chain challenges, Covid-19, and Russia’s invasion of Ukraine as causes for the sharp rise.

CBRE predicts relief next year, with cost inflation falling to 4.3% and further moderation to 2.9% in 2024. Although the firm sees inflation and supply chain problems receding over the next two years, it foresees that delays in material deliveries, labor scarcity, and semiconductor shortages will endure.

The firm’s forecast notes that demand for new projects remains strong despite cost pressures.

Related Stories

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

| May 23, 2012

MBI Modular Construction Campus Launched on BDCUniversity.com

White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.

| May 23, 2012

Gifford joins Perkins Eastman as principal

Design and planning expertise in science, technology, education, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021