The Fenestration and Glazing Industry Alliance (FGIA) updated a specification establishing minimum performance requirements for self-adhering flashing surrounding common exterior fenestration products.
AAMA 711-20, Specification for Self-Adhering Flashing Used for Installation of Exterior Wall Fenestration Products, was created in 2007. This is the document’s second update. It was last updated in 2013.
“Self-adhered flashing products are broadly used at the window/wall interface to provide a durable moisture seal and enhance the long-term performance of the installation,” said Jim Katsaros (DuPont Performance Building Solutions), chair of the FGIA Flashing Committee, in a news release. “This document specifies essential material properties, such as adhesive bond strength to various building substrates, sealability through fastener penetrations, and weathering tests for UV and thermal exposure to help ensure the long-term performance of these products.”
The new AAMA 711 standard provides significant updates to select test methods, particularly regarding sealability through fasteners and new guidelines for minimum product width. AAMA 711 is referenced in both the IRC and IBC for the use of self-adhered flashing products around windows and doors.
Related Stories
| Feb 8, 2012
Project aimed at economical seismic retrofits on historic Memphis structures
The group will develop a low-cost seismic retrofit model that would benefit aging brick-and-mortar structures. It involves bolting steel brackets to existing wooden floor and ceiling joists.
| Feb 8, 2012
Houston signs on to Better Buildings Challenge
The challenge has about $4 billion in federal and private-sector funds, which it will use for building energy upgrades nationwide in the next two years.
| Feb 8, 2012
OSHA offers free health and safety consulting for small businesses
The consultants offer confidential, non-punitive advice.
| Feb 8, 2012
Controversy over pay for prisoners on roofing job in Michigan
The disagreement was over whether the prisoners should have been paid prevailing wage for their brief time on the job because the project was paid for with a U.S. Department of Energy grant.
| Jan 30, 2012
ZigBee and ISO 50001: Two new standards to make buildings greener
These developments demonstrate the dynamic nature of the market and the continued need for development of program standards of many different types that help builders and owners translate high performance and sustainable buildings goals into practical measures on the ground.
| Jan 30, 2012
New firm-fixed-price rules on federal contracts impact construction industry
Contractors will need to be on the lookout for policies such as the Contractor Accountability for Quality clause.
| Jan 30, 2012
Roofer’s fatal plunge demonstrates need for fall-prevention regulations
“The biggest problem is getting our workers to use the equipment,” says Michael J. Florio, executive director of the organization.
| Jan 26, 2012
Tampa moves to streamlined online permitting system
The system will replace an inefficient patchwork of old software and is designed to provide businesses, homeowners, and contractors with online access to permitting and licensing information.