flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UPDATED: New details released for Universal Studios Japan’s Super Nintendo World

Events Facilities

UPDATED: New details released for Universal Studios Japan’s Super Nintendo World

The project is currently under construction in Osaka, Japan.


By David Malone, Associate Editor | January 15, 2020
Super Nintendo World Rendering

Images courtesy Universal Studios Japan

 

Updated:

As construction on Universal Studios Japan's Super Nintendo World nears completion, the company has decided to delay the opening of the theme park indefinitely due to the COVID-19 pandemic. Super Nintendo World was originally slated to open on July 1. The new park would have increased visitor numbers to Universal Studios Japan, which is already attempting to keep the number of guests at a minimum by only allowing park visitors who are annual pass holders or from the six prefectures of Kansai. No official opening date has been given. The original story follows.

 

Pop culture theme parks are all the rage right now. Universal Studios Orlando has popular attractions like The Wizarding World of Harry Potter and Springfield (home of The Simpsons) while Disney recently opened Galaxy’s Edge, its Star Wars theme park.

Now, new details have been released about the newest entry into this increasingly crowded space: Universal Studios Japan’s Super Nintendo World. After breaking ground back in 2017, Universal Studios Japan and Nintendo have recently released more information about what to expect from the project.

 

See Also: Disney announces opening dates for Star Wars-themed parks

 

In the same way Galaxy’s Edge was designed to make guests feel as if they were staring in their own Star Wars adventure, Super Nintendo World wants to make people feel like they have been teleported inside their favorite Nintendo games, with Universal Studios Japan describing the park as “a life-size, living video game.”

 

Nintendo Power UP Bands

 

Guests will be able to explore Mushroom Kingdom, Peach’s Castle, and Bowser’s Fortress and also play a real life version of Mario Kart. Custom designed wrist bands, dubbed Power Up Bands, will link to a smart phone app and connect guests to iconic Nintendo items throughout the land, like coins, keeping track of what they earn and competing against other guests.

Super Nintendo World is slated for completion this summer ahead of the 2020 Summer Olympics in Tokyo.

Related Stories

| Mar 25, 2011

Qatar World Cup may feature carbon-fiber ‘clouds’

Engineers at Qatar University’s Department of Mechanical and Industrial Engineering are busy developing what they believe could act as artificial “clouds,” man-made saucer-type structures suspended over a given soccer stadium, working to shield tens of thousands of spectators from suffocating summer temperatures that regularly top 115 degrees Fahrenheit.

| Mar 11, 2011

Historic McKim Mead White facility restored at Columbia University

Faculty House, a 1923 McKim Mead White building on Columbia University’s East Campus, could no longer support the school’s needs, so the historic 38,000-sf building was transformed into a modern faculty dining room, graduate student meeting center, and event space for visiting lecturers, large banquets, and alumni organizations.

| Feb 23, 2011

London 2012: What Olympic Park looks like today

London 2012 released a series of aerial images that show progress at Olympic Park, including a completed roof on the stadium (where seats are already installed), tile work at the aquatic centre, and structural work complete on more than a quarter of residential projects at Olympic Village.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Jan 21, 2011

Music festival’s new home showcases scenic setting

Epstein Joslin Architects, Cambridge, Mass., designed the Shalin Liu Performance Center in Rockport, Mass., to showcase the Rockport Chamber Music Festival, as well at the site’s ocean views.

| Jan 20, 2011

Houston Dynamo soccer team plans new venue

Construction is scheduled to begin this month on a new 22,000-seat Major League Soccer stadium for the Houston Dynamo. The $60 million project is expected to be ready for the 2012 MLS season.

| Jan 20, 2011

Construction begins on second St. Louis community center

O’Fallon Park Recreation Complex in St. Louis, designed by local architecture/engineering firm KAI Design & Build, will feature an indoor aquatic park with interactive water play features, a lazy river, water slides, laps lanes, and an outdoor spray and multiuse pool.

| Dec 17, 2010

Sam Houston State arts programs expand into new performance center

Theater, music, and dance programs at Sam Houston State University have a new venue in the 101,945-sf, $38.5 million James and Nancy Gaertner Performing Arts Center. WHR Architects, Houston, designed the new center to connect two existing buildings at the Huntsville, Texas, campus.

| Nov 2, 2010

Cypress Siding Helps Nature Center Look its Part

The Trinity River Audubon Center, which sits within a 6,000-acre forest just outside Dallas, utilizes sustainable materials that help the $12.5 million nature center fit its wooded setting and put it on a path to earning LEED Gold.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

boombox1
boombox2
native1

More In Category

Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021