The U.S. Department of Energy (DOE) and National Laboratories released updated versions of open-source, whole-building energy modeling tools: the EnergyPlus engine and the OpenStudio software development kit and graphical application.
EnergyPlus 9.3.0 continues to emphasize object-oriented refactoring and defect resolution. It includes refactored implementations of all coils and plant components, as well as fixes for 76 known issues and bugs.
EnergyPlus 9.3.0 also incorporates several performance enhancements from the EnergyPlus 10X project, including the ability to run shading calculations on a Graphics Processing Unit (GPU). One significant upgrade in EnergyPlus 9.3.0 is the capability to write Energy Management System (EMS) scripts in Python.
OpenStudio 3.0.0 supports the latest version of EnergyPlus, 9.3.0. This, and the latest version of Radiance 5.0.a.12, are bundled with OpenStudio distribution. This OpenStudio release includes updates to the SDK, Server, and Standards gem.
Related Stories
| Jun 21, 2012
On net-zero projects, Building Teams will be held accountable for energy-efficiency performance
The building team will be held accountable for how net-zero energy buildings perform two, five, and maybe ten years after completion.
| Jun 14, 2012
USGBC co-founder launches rating system for building product manufacturers
U.S. Green Building Council co-founder David Gottfried’s new venture, Regenerative Ventures, has established a rating system for building product manufacturers.
| Jun 14, 2012
Green standard set for single-ply roofing membrane
A sustainability standard has been established for single-ply roofing membranes used on commercial buildings.
| Jun 14, 2012
Minnesota Vikings stadium plan gets legislative go-ahead
Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.
| Jun 14, 2012
Report alleges New York’s prevailing construction wages are miscalculated, costing billions
A miscalculation in how prevailing wages are calculated in New York reportedly costs the state $3 billion a year in public-infrastructure projects.
| Jun 14, 2012
AGC, other business groups oppose hiring rules for disabled
Business groups have asked the U.S. Department of Labor to reconsider a proposed hiring quota aimed at federal contractors pertaining to people with disabilities.
| Jun 5, 2012
HP Labs aims for net-zero energy data centers
Building sustainable data centers is one of the goals of HP Labs, and it believes technology, combined with the right building techniques, could result in the construction of energy-efficient data centers.
| Jun 5, 2012
USGBC delays LEED 2012; renames it LEED v4
In response to concerns by LEED users, the U.S. Green Building Council (USGBC) announced that it will delay the ballot on LEED 2012 until June 1, 2013.