flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Updated ASCE 7-22 standard includes first-ever criteria for tornado-resistant design

Codes and Standards

Updated ASCE 7-22 standard includes first-ever criteria for tornado-resistant design

New document provides up-to-date, coordinated loading provisions for general structural design.


By Peter Fabris, Contributing Editor | December 22, 2021
Tornado

Courtesy Pixabay

The updated ASCE/SEI 7-22 Minimum Design Loads and Associated Criteria for Buildings and Other Structures includes the first-ever criteria for tornado-resistant design.

“We’re not designing tornado shelters with ASCE 7,” said J.G. (Greg) Soules, senior principal structural engineer for CB&I and vice chair of the ASCE 7-22 Committee, in a news release. “We’re simply designing for somewhat higher wind loads in certain regions of the country.”

The standard, updated every six years, provides up-to-date and coordinated loading provisions for general structural design. It prescribes design loads for all hazards including dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, seismic, wind, and fire, as well as how to evaluate load combinations.

The new update draws on new models for more accurate snow loads and includes a new multipoint seismic spectrum for certain soft-soil sites. ASCE 7-22 now requires use of digital data identified in hazard-specific geodatabases for all environmental hazards.

Related Stories

| Mar 22, 2012

Symposium on water efficiency: How much more water can be saved?

The Third International Emerging Technology Symposium by IAPMO and the World Plumbing Council features a session on water efficiency.

| Mar 22, 2012

Broker doesn’t have to inform contractor that insurer went broke, California court rules

A California appellate court ruled that an insurance broker did not have a duty to inform a subcontractor that a project’s insurer had gone bankrupt.

| Mar 22, 2012

Public agencies shouldn’t negotiate project labor agreements, says AGC official

When a public agency rather than the contractor negotiates a PLA with unions, it interferes with the right of employers and workers to reach their own agreements on working conditions and benefits, says Steve Isenhart, president of the Associated General Contractors of Washington.

| Mar 22, 2012

Proposed rule would let crane operators get licenses without prior city experience

The Bloomberg administration is considering letting operators of giant tower cranes get their license without requiring that they first run cranes as apprentices in the city for three years.

| Mar 22, 2012

Bill would reintroduce “opt-out” provision in lead paint law

The Lead Exposure Reduction Amendments Act of 2012 (S2148) would restore the "Opt-Out" provision removed from the Environmental Protection Agency's Lead Renovate, Repair and Painting (LRRP) rule in April 2010.

| Mar 15, 2012

New Florida building code establishes flood and storm surge provisions

The new 2010 code establishes minimum design and construction requirements to protect buildings from wind, rain, floods, and storm surges.

| Mar 15, 2012

Illinois city rejects international code due to home sprinkler requirement

Macomb, Illinois aldermen voted to recommend that the city not adopt 2012 international building and residential code standards requiring the installation of overhead sprinkler systems in newly constructed one-family and two-family homes.

| Mar 15, 2012

Tenant advocates propose licensing landlords in New York City

With thousands of New York City rental units posing potential dangers to tenants, city advocates are proposing measures to make landlords improve building safety.

| Mar 15, 2012

Construction industry a big winner in federal small disadvantaged business procurement

Last year, only 5% of federal contract dollars went to small disadvantaged businesses. Construction and facilities support firms were the biggest beneficiaries.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021