The updated ASCE/SEI 7-22 Minimum Design Loads and Associated Criteria for Buildings and Other Structures includes the first-ever criteria for tornado-resistant design.
“We’re not designing tornado shelters with ASCE 7,” said J.G. (Greg) Soules, senior principal structural engineer for CB&I and vice chair of the ASCE 7-22 Committee, in a news release. “We’re simply designing for somewhat higher wind loads in certain regions of the country.”
The standard, updated every six years, provides up-to-date and coordinated loading provisions for general structural design. It prescribes design loads for all hazards including dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, seismic, wind, and fire, as well as how to evaluate load combinations.
The new update draws on new models for more accurate snow loads and includes a new multipoint seismic spectrum for certain soft-soil sites. ASCE 7-22 now requires use of digital data identified in hazard-specific geodatabases for all environmental hazards.
Related Stories
Codes and Standards | Apr 25, 2016
GSA adopts SITES land development and management rating system
Federal agency will use for properties with and without buildings.
Wood | Apr 22, 2016
Revised 2015 Manual for Engineered Wood Construction available
American Wood Council Document offers design information for structural applications.
Codes and Standards | Apr 20, 2016
OSHA updates eye and face protection standards in final rule
Becomes effective April 26.
Codes and Standards | Apr 18, 2016
Efficiency finance pilot project to spur retrofits on existing buildings
EDF and PG&E team up on interest-free loans for qualified projects.
Codes and Standards | Apr 18, 2016
ASHRAE releases proposed energy standard for historic buildings
Designed to balance with preservation requirements.
Codes and Standards | Apr 13, 2016
Canadian city fines itself for failing to get a building permit for building renovation
Guelph, Ontario, will pay a $1,125 fine to the province.
Codes and Standards | Apr 12, 2016
Construction trade groups sue OSHA over silica rule
Cite concerns about technological and economic feasibility.
Codes and Standards | Apr 11, 2016
New LEED 2009 projects will have to meet increased minimum energy performance
New requirements went into effect April 8.
Wood | Apr 8, 2016
New LEED Pilot ACP designed to help eliminate irresponsibly sourced materials
Illegal wood is primary target to restrict illicit material in the supply chain.
Lighting | Apr 5, 2016
Lighting requirements for high-rise dwellings proposed for energy standard
The requirements would effectively eliminate incandescent and halogen bulbs.