flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UNT lab designed to study green energy technologies completed

UNT lab designed to study green energy technologies completed

Lab to test energy technologies and systems in order to achieve a net-zero consumption of energy.


By By BD+C Staff | April 16, 2012
Construction on UNTs new facility began in July 2011. A ribbon cutting ceremony
Construction on UNTs new facility began in July 2011. A ribbon cutting ceremony will be held at UNTs Discovery Park on Friday,

The completion of the Zero Energy Research Laboratory at the University of North Texas will give students and researchers the tools to study the next generations of sustainable and renewable energy technologies.

The lab—the only one of its kind in Texas—is designed specifically to test various energy technologies and systems in order to achieve a net-zero consumption of energy.

Construction on UNT’s new facility began in July 2011. A ribbon cutting ceremony will be held at UNT’s Discovery Park on Friday, April 20 to celebrate the completion of the new facility.

The structure has a number of advanced energy technologies integrated into its 1,200-sf space, including a geothermal heat pump, a radiant heated floor slab, solar panels, a building energy monitoring and control system and a rainwater collection system, to name a few. Outside, the facility has a residential-scale wind turbine and an electric vehicle charging station.

The doors, windows, roof and supporting energy efficient equipment are designed to be easily expanded and exchanged so that researchers can analyze new building materials. Dr. Nandika D’Souza and her research team hope to use the facility to test their plant-based building materials eventually. D’Souza is developing materials made from the fibers of the kenaf plant, a cousin to bamboo, with a $600,000 grant from the National Science Foundation.

D’Souza is a key member of the Renewable Bioproducts and the Renewable Energy and Conservation research clusters. Both interdisciplinary research groups will take advantage of this unique facility to conduct cutting edge sustainability and energy research.

Dr. Yong Tao, chair of the Department of Mechanical and Energy engineering at UNT and the PACCAR Professor of Engineering, spearheaded the design and creation of the lab. Previously, Tao oversaw a similar project at Florida International University, where he served as an associate dean of their College of Engineering and Computing.

Tao also served as the director of the Future House USA project, an initiative that brought together academics, builders, industry sponsors and lobbyists to create a 3,200 square-foot zero-net energy house. The house was built in Beijing and displayed during the 2008 Olympic Games.

This project is funded at $1,150,000 with a combination of HEAF (higher education assistance funds), operating funds and gifts-in-kind. It was made possible by donations from Schneider Electric, NuconSteel, Axium Solar, H2Options/BlueScope Water, Benchmark Precision Buildings and Acme Brick. Jacobs Engineering Group Inc. is the architect of record for the facility and Nouveau Construction served as the general contractor. BD+C

Related Stories

Industry Research | Jun 15, 2023

Exurbs and emerging suburbs having fastest population growth, says Cushman & Wakefield

Recently released county and metro-level population growth data by the U.S. Census Bureau shows that the fastest growing areas are found in exurbs and emerging suburbs. 

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

University Buildings | Jun 14, 2023

Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses

A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.

Higher Education | Jun 14, 2023

Designing higher education facilities without knowing the end users

A team of architects with Page offers five important factors to consider when designing spaces for multiple—and potentially changing—stakeholders.

Resiliency | Jun 14, 2023

HUD offers $4.8 billion in funding for green and resilient building retrofit projects

The Department of Housing and Urban Development (HUD) recently released guidelines for its Green and Resilient Retrofit Program (GRRP) that has $4.8 billion for funding green projects.

Arenas | Jun 14, 2023

A multipurpose arena helps revitalize a historic African American community in Georgia

In Savannah, Ga., Enmarket Arena, a multipurpose arena that opened last year, has helped revitalize the city’s historic Canal District—home to a largely African American community that has been historically separated from the rest of downtown.

Building Materials | Jun 14, 2023

Construction input prices fall 0.6% in May 2023

Construction input prices fell 0.6% in May compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices declined 0.5% for the month.

Mass Timber | Jun 13, 2023

Mass timber construction featured in two-story mixed-use art gallery and wine bar in Silicon Valley

The Edes Building, a two-story art gallery and wine bar in the Silicon Valley community of Morgan Hill, will prominently feature mass timber. Cross-laminated timber (CLT) and glulam posts and beams were specified for aesthetics, biophilic properties, and a reduced carbon footprint compared to concrete and steel alternatives.

Mixed-Use | Jun 12, 2023

Goettsch Partners completes its largest China project to date: a mixed-used, five-tower complex

Chicago-based global architecture firm Goettsch Partners (GP) recently announced the completion of its largest project in China to date: the China Resources Qianhai Center, a mixed-use complex in the Qianhai district of Shenzhen. Developed by CR Land, the project includes five towers totaling almost 472,000 square meters (4.6 million sf). 

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021