flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UNT lab designed to study green energy technologies completed

UNT lab designed to study green energy technologies completed

Lab to test energy technologies and systems in order to achieve a net-zero consumption of energy.


By By BD+C Staff | April 16, 2012
Construction on UNTs new facility began in July 2011. A ribbon cutting ceremony
Construction on UNTs new facility began in July 2011. A ribbon cutting ceremony will be held at UNTs Discovery Park on Friday,

The completion of the Zero Energy Research Laboratory at the University of North Texas will give students and researchers the tools to study the next generations of sustainable and renewable energy technologies.

The lab—the only one of its kind in Texas—is designed specifically to test various energy technologies and systems in order to achieve a net-zero consumption of energy.

Construction on UNT’s new facility began in July 2011. A ribbon cutting ceremony will be held at UNT’s Discovery Park on Friday, April 20 to celebrate the completion of the new facility.

The structure has a number of advanced energy technologies integrated into its 1,200-sf space, including a geothermal heat pump, a radiant heated floor slab, solar panels, a building energy monitoring and control system and a rainwater collection system, to name a few. Outside, the facility has a residential-scale wind turbine and an electric vehicle charging station.

The doors, windows, roof and supporting energy efficient equipment are designed to be easily expanded and exchanged so that researchers can analyze new building materials. Dr. Nandika D’Souza and her research team hope to use the facility to test their plant-based building materials eventually. D’Souza is developing materials made from the fibers of the kenaf plant, a cousin to bamboo, with a $600,000 grant from the National Science Foundation.

D’Souza is a key member of the Renewable Bioproducts and the Renewable Energy and Conservation research clusters. Both interdisciplinary research groups will take advantage of this unique facility to conduct cutting edge sustainability and energy research.

Dr. Yong Tao, chair of the Department of Mechanical and Energy engineering at UNT and the PACCAR Professor of Engineering, spearheaded the design and creation of the lab. Previously, Tao oversaw a similar project at Florida International University, where he served as an associate dean of their College of Engineering and Computing.

Tao also served as the director of the Future House USA project, an initiative that brought together academics, builders, industry sponsors and lobbyists to create a 3,200 square-foot zero-net energy house. The house was built in Beijing and displayed during the 2008 Olympic Games.

This project is funded at $1,150,000 with a combination of HEAF (higher education assistance funds), operating funds and gifts-in-kind. It was made possible by donations from Schneider Electric, NuconSteel, Axium Solar, H2Options/BlueScope Water, Benchmark Precision Buildings and Acme Brick. Jacobs Engineering Group Inc. is the architect of record for the facility and Nouveau Construction served as the general contractor. BD+C

Related Stories

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

Industrial Facilities | Apr 9, 2024

Confessions of a cold storage architect

Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.

Cultural Facilities | Apr 8, 2024

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

Green | Apr 8, 2024

LEED v5 released for public comment

The U.S. Green Building Council (USGBC) has opened the first public comment period for the first draft of LEED v5. The new version of the LEED green building rating system will drive deep decarbonization, quality of life improvements, and ecological conservation and restoration, USGBC says. 

Codes and Standards | Apr 8, 2024

Boston’s plans to hold back rising seawater stall amid real estate slowdown

Boston has placed significant aspects of its plan to protect the city from rising sea levels on the actions of private developers. Amid a post-Covid commercial development slump, though, efforts to build protective infrastructure have stalled.

Sustainability | Apr 8, 2024

3 sustainable design decisions to make early

In her experience as an architect, Megan Valentine AIA, LEED AP, NCARB, WELL AP, Fitwel, Director of Sustainability, KTGY has found three impactful sustainable design decisions: site selection, massing and orientation, and proper window-to-wall ratios.

Brick and Masonry | Apr 4, 2024

Best in brick buildings: 9 projects take top honors in the Brick in Architecture Awards

The Ace Hotel Toronto, designed by Shim-Sutcliffe Architects, and the TCU Music Center by Bora Architecture & Interiors are among nine "Best in Class" winners and 44 overall winners in the Brick Industry Association's 2023 Brick in Architecture Awards.

Retail Centers | Apr 4, 2024

Retail design trends: Consumers are looking for wellness in where they shop

Consumers are making lifestyle choices with wellness in mind, which ignites in them a feeling of purpose and a sense of motivation. That’s the conclusion that the architecture and design firm MG2 draws from a survey of 1,182 U.S. adult consumers the firm conducted last December about retail design and what consumers want in healthier shopping experiences.

Healthcare Facilities | Apr 3, 2024

Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion

A redesign of the Mayo Clinic’s downtown campus in Rochester, Minn., centers around two new clinical high-rise buildings. The two nine-story structures will reach a height of 221 feet, with the potential to expand to 420 feet.

Sports and Recreational Facilities | Apr 2, 2024

How university rec centers are evolving to support wellbeing

In a LinkedIn Live, Recreation & Wellbeing’s Sadat Khan and Abby Diehl joined HOK architect Emily Ostertag to discuss the growing trend to design and program rec centers to support mental wellbeing and holistic health.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021