flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

University of Texas at Dallas breaks ground on new 12-acre cultural district

Museums

University of Texas at Dallas breaks ground on new 12-acre cultural district

Athenæum project includes performance hall and two museums.


By Peter Fabris, Contributing Editor | May 31, 2022
UTD Crow Arrival
Courtesy Morphosis Architects.

The University of Texas at Dallas (UT Dallas) recently broke ground on the Crow Museum of Asian Art, the first phase of a new 12-acre cultural district on campus. The Edith and Peter O’Donnell Jr. Athenæum will be an arts destination for students, faculty, and community.

Designed by global architecture and design firm Morphosis, the arts campus will create a new gateway to the university and include a performance hall, a museum for the traditional arts of the Americas, a central plaza, and a parking structure. The Athenaeum is part of a significant period of growth of the arts at UT Dallas, a school that has historically focused on science, engineering, technology, and business.

The cohesive and dynamic vision for the Athenæum is intended to establish UT Dallas as a cultural hub with outdoor features including landscaped gardens, tree-lined walkways, paved open spaces with benches and water features, an amphitheater, and public sculptures. The plan knits together the buildings within the Athenæum and provides important pedestrian connections to the rest of the campus.

The two-story, 68,000 sf Crow Museum, which includes 12,000 sf of contiguous outdoor space for programs and events, will be completed in Phase I in 2024. It will have 16,000 sf of flexible gallery space to display the collection’s diverse selection of Asian art with ancient and contemporary works from Cambodia, China, India, Indonesia, Japan, Korea, Myanmar, Nepal, Pakistan, Thailand, Tibet, and Vietnam. The museum will also house a state-of-the-art conservation lab, classroom spaces, administrative offices, and the Brettell Reading Room.

Another building, a two-story 53,000 sf performance hall, will include a 600-seat concert venue, practice rooms, choral and orchestra rehearsal rooms, to be constructed in Phase II. A two-story 50,000 sf museum for the traditional arts of the Americas will be completed in Phase III. A three-story 1,100-car parking structure with two levels above grade and one basement-level walk-out will serve the Athenæum and campus.  

The three cultural buildings are designed with second floors that are larger than the ground floor, creating covered exterior spaces that can be used for studying, building entry, daytime and nighttime events and gatherings, performances, art display, and everyday campus life. Each building is clad with white precast concrete panels featuring a three-dimensional pattern created through an innovative process designed by Morphosis.

Building Team:

Owner: University of Texas at Dallas
Design architect: Morphosis
Architect of record: GFF
Design MEP Engineer: Buro Happold
MEP Engineer of Record: Campos Engineering
Structural engineer: Datum Engineers
General contractor/construction manager: The Beck Group
 

UTD Crow Gallery
Rendering of Crow Museum of Asian Art at the O'Donnell Athenaeum at UT Dallas, view of interior gallery. Courtesy Morphosis Architects.
UTD Crow Lobby
Rendering of Crow Museum of Asian Art at the O'Donnell Athenaeum at UT Dallas, view of lobby. Courtesy Morphosis Architects.
UTD Crow Plaza
Rendering of Crow Museum of Asian Art at the O'Donnell Athenaeum at UT Dallas, view of plaza from north direction. Courtesy Morphosis Architects.

 

Related Stories

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

| Jun 28, 2013

Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report

A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals. 

| Jun 25, 2013

Mirvish, Gehry revise plans for triad of Toronto towers

A trio of mixed-use towers planned for an urban redevelopment project in Toronto has been redesigned by planners David Mirvish and Frank Gehry. The plan was announced last October but has recently been substantially revised.

| Jun 25, 2013

DC commission approves Gehry's redesign for Eisenhower memorial

Frank Gehry's updated for a new Dwight D. Eisenhower memorial in Washington, D.C., has been approved by the Eisenhower Memorial Commission, reports the Washington Post. The commission voted unanimously to approve the $110 million project, which has been gestating for 14 years.

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

| Jun 3, 2013

Construction spending inches upward in April

The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.

| May 21, 2013

7 tile trends for 2013: Touch-sensitive glazes, metallic tones among top styles

Tile of Spain consultant and ceramic tile expert Ryan Fasan presented his "What's Trending in Tile" roundup at the Coverings 2013 show in Atlanta earlier this month. Here's an overview of Fasan's emerging tile trends for 2013.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021