The University of Oregon’s Matthew Knight Arena opened January 13 with a men’s basketball game against USC. The $227 million arena, which replaces the school’s 84-year-old McArthur Court, was designed by Ellerbe Becket, Kansas City, Mo., in collaboration with TVA Architects, of Portland, Ore., JMI Sports (program manager), Henderson Engineers (MEP), Haris Engineering (structural engineer), and Hoffman Construction (CM). The three-story, 405,000-sf facility has a seating bowl pitched at 36 degrees to replicate the close-to-the-action feel of the smaller arena it replaced, although this new one accommodates 12,364 fans. The facility also has two club areas, event-level lounges, and training, weight, and locker rooms. The project is targeting LEED Gold. By the way, the Ducks beat the Trojans, 68-62.
Related Stories
| Apr 12, 2013
Nation's first 'food forest' planned in Seattle
Seattle's Beacon Food Forest project is transforming a seven-acre lot in the city’s Beacon Hill neighborhood into a self-sustaining, edible public park.
| Apr 12, 2013
Chicago rail conversion puts local twist on High Line strategy
Plans are moving forward to convert an unused, century-old Chicago rail artery to a 2.7 mile, 13 acre recreational facility and transit corridor.