Van H. Gilbert Architect PC, the Albuquerque-based design firm recognized for its leadership in sustainable design, announced the Science and Math Learning Center on the University of New Mexico Campus achieved Gold certification from the US Green Building Council. The LEED for Schools rating system is unique among other LEED programs as it addresses core learning areas and requires higher performance standards for air quality, acoustics, daylighting, and thermal comfort.
Under the LEED for Schools rating system, VHGA and design partner Shepley Bulfinch implemented a wide range of sustainable design strategies and techniques that focus on enhancing the learning environment.
The Science and Math Learning Center anticipates a 24% reduction in energy use as compared to a similar building, at an annual savings of $65,000. The building’s exterior detailing responds to the strong New Mexico sun with deeply set windows on the south and north facades and sophisticated sun screening on the south. Sustainable features include the use of daylight to flood all classrooms; artificial light sensors; light shelves that bring light deep into building spaces; controlled light entering the science labs; and natural daylight to all offices on the north side of the building. The construction methods of general contractor McCarthy NM were important contributions to achieving gold certification. BD+C
Related Stories
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 23, 2012
AAMA releases updated specification for anodized aluminum
AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.
| Apr 23, 2012
Thornton Tomasetti project wins AISC Merit Award
Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.
| Apr 23, 2012
Construction underway on City Winery Chicago
The Building Team is maintaining the old brick and timber construction, while adding 5,000-sf of new construction in the form of a two-story addition within the site’s existing courtyard.
| Apr 20, 2012
McCarthy completes Santa Barbara Cottage Hospital Replacement Facility
The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.
| Apr 20, 2012
Century-old courthouse renovated for Delaware law firm offices
To account for future expansion, Francis Cauffman developed a plan to accommodate the addition of an 8-story tower to the building.
| Apr 20, 2012
RCMA and Oak Ridge National Laboratory to host International Roof Coatings Conference
The International Roof Coatings Conference will feature keynote speakers Marc LaFrance of the U.S. Department of Energy, and Art Rosenfeld of the Lawrence Berkeley National Laboratory.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 20, 2012
Registration open for Solar Power International 2012 in Orlando
President Bill Clinton to deliver keynote address at ?largest solar energy event in the Americas.
| Apr 19, 2012
The 10 mistakes most likely to get you sued
The California Chamber of Commerce has produced a white paper cataloging the top 10 mistakes most likely to get a company sued. While a few of the laws cited apply specifically to California, some of them are federal and may apply in your state.