Van H. Gilbert Architect PC, the Albuquerque-based design firm recognized for its leadership in sustainable design, announced the Science and Math Learning Center on the University of New Mexico Campus achieved Gold certification from the US Green Building Council. The LEED for Schools rating system is unique among other LEED programs as it addresses core learning areas and requires higher performance standards for air quality, acoustics, daylighting, and thermal comfort.
Under the LEED for Schools rating system, VHGA and design partner Shepley Bulfinch implemented a wide range of sustainable design strategies and techniques that focus on enhancing the learning environment.
The Science and Math Learning Center anticipates a 24% reduction in energy use as compared to a similar building, at an annual savings of $65,000. The building’s exterior detailing responds to the strong New Mexico sun with deeply set windows on the south and north facades and sophisticated sun screening on the south. Sustainable features include the use of daylight to flood all classrooms; artificial light sensors; light shelves that bring light deep into building spaces; controlled light entering the science labs; and natural daylight to all offices on the north side of the building. The construction methods of general contractor McCarthy NM were important contributions to achieving gold certification. BD+C
Related Stories
| Mar 21, 2014
Pier Carlo Bontempi to receive Richard H. Driehaus Prize from Notre Dame
Established in 2003 by the Notre Dame School of Architecture, the $200,000 Richard H. Driehaus Prize is awarded to a living architect whose work embodies the highest ideals of traditional and classical architecture in contemporary society, and creates a positive cultural, environmental and artistic impact.
| Mar 21, 2014
How to get more referrals
If you’re having a hard time attracting new referrals, here are a few techniques for increasing the number of interactions with potential clients.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 20, 2014
D.C. breaks ground on $2B mega waterfront development [slideshow]
When complete, the Wharf will feature approximately 3 million sf of new residential, office, hotel, retail, cultural, and public uses, including waterfront parks, promenades, piers, and docks.
| Mar 20, 2014
13 dazzling wood building designs [slideshow]
From bold structural glulam designs to striking textured wall and ceiling schemes, these award-winning building projects showcase the design possibilities using wood.
| Mar 20, 2014
Fluor defines the future 7D deliverable without losing sight of real results today
A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation.
| Mar 19, 2014
Architecture Billings Index shows slight improvement
The American Institute of Architects (AIA) reported that the February ABI score was 50.7, up slightly from a mark of 50.4 in January.
| Mar 19, 2014
Gehry, Zaha, Foster, Meier: Vote for your top 'starchitect' in this March Madness design legends tourney
Fast Company's Bracket Madness tournament pits 32 designers against each other to see who truly is the world's greatest living designer.
| Mar 19, 2014
Is it time to start selecting your own clients?
Will 2014 be the year that design firms start selecting the clients they want rather than getting in line with competitors to respond to RFPs? That’s the question posed by a recent thought-provoking article.
| Mar 19, 2014
How to develop a healthcare capital project using a 'true north charter'
Because healthcare projects take years to implement, developing a true north charter is essential for keeping the entire team on track and moving in the right direction.