Howard L. Hawks Hall is the new $84 million, 240,000-sf home for the University of Nebraska-Lincoln’s College of Business. Created by Nashville-based Advent, the linear and clean design of the interior space incorporates wood tones, pops of Nebraska red, and lifestyle imagery of students.
Upon entering into the Henrickson Grand Atrium, a 14-foot-tall display features the founders (three recent University of Nebraska graduates) of HUDL, a software company aiding football coaches in evaluation and preparation.
Accompanied by six iPads – one for each faculty member – this display shows a cross-section of Nebraska’s diverse and accomplished group of professors in research.
Another display features an in-depth look at each of the six faculty members. Accompanied by six iPads, one for each faculty member, the display allows visitors to scroll through biographical information and academic publications of each of the professors in research.
In total there are 8 digital displays that highlight the relationships created and fostered in the Nebraska College of Business. There are an additional 113 custom pieces of donor recognition and 26 corporate logos featured in exhibits and the donor recognition pieces.
Greeting visitors upon entry in the Henrickson Grand Atrium is a 14-foot tall display featuring the founders of HUDL.
Each storytelling piece in Hawks Hall is guided by the theme of “Start Something.” This mantra is meant to urge students to start a business or a trend, “Start Serving” in community service, and to “Start Connecting” with Fortune 500 companies.
The College of Business is also a key recruiting tool for Nebraska’s athletic program. This display shows five athletes – each in different sports – who are exemplary business students in addition to standout athletes.
Nebraska hosted the opening gala of Hawks Hall in October of this year.
A message to current and prospective students is the Start Connecting display, showcasing the range of businesses that recruit talent from the program.
Related Stories
| Jan 3, 2012
New Chicago hospital prepared for pandemic, CBR terror threat
At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters.
| Dec 20, 2011
Gluckman Mayner Architects releases design for Syracuse law building
The design reflects an organizational clarity and professional sophistication that anticipates the user experience of students, faculty, and visitors alike.
| Dec 19, 2011
HGA renovates Rowing Center at Cornell University
Renovation provides state-of-the-art waterfront facility.
| Dec 16, 2011
Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University
The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration.
| Dec 5, 2011
Fraser Brown MacKenna wins Green Gown Award
Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.
| Dec 2, 2011
Goody Clancy awarded Ohio State residential project
The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 18, 2011
Centre for Interactive Research on Sustainability opens
Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.