flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

University of Louisville Student Success Building will be new heart of engineering program

University Buildings

University of Louisville Student Success Building will be new heart of engineering program

The 115,000-sf structure will expand lab space, consolidate functions


By Peter Fabris, Contributing Editor | July 17, 2024
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup

A new Student Success Building will serve as the heart of the newly designed University of Louisville’s J.B. Speed School of Engineering. The 115,000-sf structure will greatly increase lab space and consolidate student services to one location.

Currently admissions counselors, academic counselors, tutors, student success coordinators, co-op counselors, and other support teams are located on different floors and in multiple buildings. The plan groups all the support teams into a single connected office suite. A central help desk at the main entrance will assist students to receive the most appropriate support services. Shared collaborative spaces will facilitate regular meetings among the different teams, and shared office support will streamline internal operations.

The new university building will serve as a valuable “home base” for students, especially during their first year. It will house classes, provide access to tutoring, enable meetings with academic and co-op counselors, host student success seminars, offer study spaces and meeting rooms for student groups, and feature an informal recreational area.

Maker space at University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Maker space at the University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup

An engineering garage space will serve as a hub for hands-on learning and competition team activities. This area will provide ample room for students to work on projects, build prototypes, and conduct experiments. It will be equipped with specialized tools, machinery, and materials to support various engineering disciplines. The garage space will not only enhance students’ technical skills but also promote teamwork, collaboration, and problem-solving abilities. Engineering students will have the opportunity to participate in competitions, where they can apply their knowledge, learn from their peers, and showcase their innovations.

The second and third floors will house lab space for the university’s Conn Center for Renewable Energy Research, where researchers will study solar power, green fuels, and materials. Construction is underway, with an expected completion date of summer 2025.

Owner and/or developer: University of Louisville
Design architect: SmithGroup
Architect of record: Luckett & Farley
MEP engineer: Luckett & Farley
Structural engineer: SmithGroup
General contractor/construction manager: Whittenberg Construction

University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup
University of Louisville's J.B. Speed School of Engineering Student Success Building. Rendering courtesy SmithGroup
Rendering courtesy SmithGroup

Related Stories

University Buildings | Nov 4, 2015

Yale completes Singapore campus

The Yale-NUS College has three residence halls and two administrative and academic buildings, with courtyards in the middle of them all.

University Buildings | Oct 16, 2015

5 ways architecture defines the university brand

People gravitate to brands for many reasons. Campus architecture and landscape are fundamental influences on the college brand, writes Perkins+Will's David Damon.

University Buildings | Oct 16, 2015

Competency-based learning: A glimpse into the future of higher education?

For better or worse, the higher education experience for many young Millennials and Gen Zers will not resemble the four-year, life-altering experience that we enjoyed—it’s just too costly.

University Buildings | Sep 21, 2015

Vietnamese university to turn campus into ‘terraced forest’

Pockets of plantings will be dispersed throughout the staggered floors of the building, framing the expansive courtyard at its center. 

University Buildings | Sep 21, 2015

6 lessons in campus planning

For campus planning, focus typically falls on repairing the bricks and mortar without consideration of program priorities. Gensler's Pamela Delphenich offers helpful tips and advice.

Mixed-Use | Aug 26, 2015

Innovation districts + tech clusters: How the ‘open innovation’ era is revitalizing urban cores

In the race for highly coveted tech companies and startups, cities, institutions, and developers are teaming to form innovation hot pockets.

University Buildings | Aug 13, 2015

Best of Education Design: 9 projects named AIA Education Facility Design Award winners

Georgia Tech's Clough Commons, Boston's Berklee Tower, and seven other facilities were honored for aiding learning and demonstrating excellent architectural design.

Giants 400 | Aug 7, 2015

UNIVERSITY SECTOR GIANTS: Collaboration, creativity, technology—hallmarks of today’s campus facilities

At a time when competition for the cream of the student/faculty crop is intensifying, colleges and universities must recognize that students and parents are coming to expect an education environment that foments collaboration, according to BD+C's 2015 Giants 300 report.

Contractors | Jul 29, 2015

Consensus Construction Forecast: Double-digit growth expected for commercial sector in 2015, 2016

Despite the adverse weather conditions that curtailed design and construction activity in the first quarter of the year, the overall construction market has performed extremely well to date, according to AIA's latest Consensus Construction Forecast.

University Buildings | Jul 28, 2015

OMA designs terraced sports center for UK's Brighton College

Designs for what will be the biggest construction project in the school’s 170-year history feature a rectangular building at the edge of the school’s playing field. A running track is planned for the building’s roof, while sports facilities will be kept underneath.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021