flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The University of Iowa opens the new Stanley Museum of Art, a public museum for both discovering and teaching art

The University of Iowa opens the new Stanley Museum of Art, a public museum for both discovering and teaching art

Following historic flooding in 2008, the building restores an art museum to the campus after 14 years.


By Novid Parsi, Contributing Editor | September 1, 2022
The University of Iowa Stanley of Museum
Courtesy BNIM.

The University of Iowa recently completed its new Stanley Museum of Art, a public teaching museum designed by BNIM. The 63,000-square-foot building restores an art museum to the campus after 14 years, following historic flooding in 2008. The Stanley Museum of Art reunites the school with its renowned collections and works, such as Jackson Pollock’s Mural, which had been temporarily held by art institutions around the world.

The University of Iowa Stanley Museum of Art is a public museum for discovering and teaching art, as well as a center for campus connection. The building features a transparent main lobby and a new entry plaza for art displays, performances, social gatherings, and classes. A series of flexible gallery spaces offers students, faculty, and visitors space for observing, discussing, and exploring the collections. The galleries’ proportions allow for faculty to curate collections for teaching and research and for students to learn about curating, which is central to the museum’s mission.

The museum’s upper floors include a visual arts laboratory classroom where the collections can be used for teaching. Collaborative staff and volunteer spaces also support the research and teaching of the collections.

A dark, kinetic brick facade, with alternating brick texture and brick finish, reflects the changing sunlight. The lobby’s glass facade and a series of interconnected voids throughout the building establish connections to natural light and guide the visitor experience. Outdoor terraces also serve as spaces for socializing and school visits.

On the Building Team:
Owner: The University of Iowa
Design architect: BNIM
Architect of record: BNIM
MEP engineer: Design Engineers
Structural engineer: Meyer Borgman Johnson
General contractor/construction manager: Russell Construction

Related Stories

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

| Mar 5, 2012

Franklin Institute in Philadelphia selects Skanska to construct new pavilion

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 9, 2011

Lincoln Center Pavilion wins national architecture and engineering award

The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York. 

| Oct 12, 2011

BIM Clarification and Codification in a Louisiana Sports Museum

The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Apr 13, 2011

Expanded Museum of the Moving Image provides a treat for the eyes

The expansion and renovation of the Museum of the Moving Image in the Astoria section of Queens, N.Y., involved a complete redesign of its first floor and the construction of a three-story 47,000-sf addition.

| Apr 12, 2011

Entrance pavilion adds subtle style to Natural History Museum of Los Angeles

A $13 million gift from the Otis Booth Foundation is funding a new entrance pavilion at the Natural History Museum of Los Angeles County. CO Architects, Los Angeles, is designing the frameless structure with an energy-efficient curtain wall, vertical suspension rods, and horizontal knife plates to make it as transparent as possible.

| Jan 21, 2011

Sustainable history center exhibits Fort Ticonderoga’s storied past

Fort Ticonderoga, in Ticonderoga, N.Y., along Lake Champlain, dates to 1755 and was the site of battles in the French and Indian War and the American Revolution. The new $20.8 million, 15,000-sf Deborah Clarke Mars Education Center pays homage to the French magasin du Roi (the King’s warehouse) at the fort.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021