flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

University of Hawaii’s new Administration & Allied Health Building nears completion

University Buildings

University of Hawaii’s new Administration & Allied Health Building nears completion

Perkins+Will’s LA Studio designed the building.


By David Malone, Associate Editor | April 18, 2018
University of Hawaii Administration & Allied Health Building

Perkins+Will’s LA Studio designed the building

The University of Hawaii West Oahu campus is nearing the completion of its newest building, the 43,000-sf Administration and Allied Health Building.

The new $36 million facility consolidates office space for campus leadership into a single location and also provides general purpose classrooms and wet/dry teaching laboratories for microbiology, cellular/molecular, anatomy/physiology, and organic chemistry.

Designed by Perkins+Will’s LA Studio in collaboration with KYA Design Group, the building design was inspired by the gable roof form of historic sugar mills common to the area. The building enclosure utilizes CMU (concrete masonry unit) as a monolithic skin with its texture and pattern inspired by traditional Hawaiian kapa (cloth).

 

The new Administration & Allied Health BuildingCourtesy of Perkins+Will's LA Studio.

 

On the southern facade, deep, open-air lanais (balconies) connect the interior and outdoor circulation. The lanais act as a natural gathering space, an extension of the classroom, and are connected visually and physically to the Great Lawn. 

 

See Also: University of Hawaii Maui College on pace to become first U.S. campus to generate 100% renewable energy on-site

 

“The challenge was how to best consolidate the distinct functions of teaching labs and classrooms within the same building as office space for the campus administration,” says Mark Tagawa, Associate Principal at Perkins+Will’s LA Studio, in a release. “We wanted to create a facility that interacted with the landscape in a sympathetic way, through water management, landscaping, and materiality. Cultural and ecological appropriateness was our filter for all design decisions.”

 

A lanai at the University of HawaiiCourtesy of Perkins+Will's LA Studio.

 

The campus is located on former sugar cane land with a legacy of over 100 years of agriculture. Sustained tilling has left the topsoil depleted of organic matter, which decreases the ability to retain water and support new plant life. The project seeks to rectify this issue by restoring, healing, and rebuilding the topsoil via nitrogen fixing planting, implementing onsite ecological water and nutrient management, and regenerating and reviving native landscaping.

The Administration & Allied Health Building will open to students in spring 2019.

 

The U of Hawaii Administration & Allied Health BuildingCourtesy of Perkins+Will's LA Studio.

Related Stories

University Buildings | Oct 12, 2017

USC to debut new bioscience center next month

The building is designed to maximize recruitment and interaction of scientists and researchers.

University Buildings | Oct 12, 2017

The Center for Wounded Veterans is a first for a university campus

The Chez Family Foundation Center for Wounded Veterans in Higher Education is the first building of its kind on a U.S. college campus.

University Buildings | Oct 10, 2017

A 1920s cheese factory is now a university science building

Almost 15,000 sf of space was added to the original, four-story building.

Sustainability | Oct 9, 2017

New Arizona State University building will reach triple net-zero performance

The science and research complex will include an atrium biome filled with plants and water.

Higher Education | Sep 18, 2017

Campus landscape planning of the future: A University of Wisconsin-Madison case study

Recognizing that the future health of the campus and lake are interdependent, this innovative approach will achieve significant improvements in stormwater management and water quality within the university’s restored, more connected network of historic and culturally rich landscapes.

University Buildings | Sep 15, 2017

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.

Sports and Recreational Facilities | Sep 11, 2017

Mid-size, multi-use arenas setting a trend for the future

While large 20,000-seat sports venues aren’t going away, mid-size venues provide advantages the big arenas do not in a time of budget constraints and the need for flexibility.

Giants 400 | Sep 7, 2017

Top 95 university construction firms

Turner Construction Co., The Whiting-Turner Contracting Co., and Barton Malow top BD+C’s ranking of the nation’s largest university sector contractor and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Sep 7, 2017

Mashup in the halls of ivy: Campus expansions put the emphasis on elevating the student experience

Today’s multi-functional buildings support a diverse range of academic programs, with transparent walls to foster interdisciplinary collaboration.

University Buildings | Sep 5, 2017

Rohrer College of Business supports the schools academic programs with several key spaces

Designed by KSS Architects and Goody Clancy, the new facility opened prior to the fall 2017 school year.

boombox1
boombox2
native1

More In Category


Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021