Less than a month after the University of Hawaii released designs from world renowned architects for its bid to host the Barack Obama Presidential Library, fellow bidder (and popular contender) University of Chicago has finally released its plans for the library—but without designs of the actual library building itself.
Renderings by Skidmore, Owings & Merrill (SOM) that accompanied the university’s statement officially released yesterday on UC's website depicted what development in the area would look like if the library were to open there.
“Locating the Barack Obama Presidential Library on Chicago’s South Side offers a rare chance to reinvigorate the economy of nearby communities and make improvements for the area’s infrastructure and parks,” Susan Sher, Senior Adviser to University of Chicago President Robert J. Zimmer, told UChicago News.
According to the Chicago Sun-Times, there are two proposed sites for the plan, both owned by the Chicago Park District in Chicago’s South Side, near the university’s campus in Hyde Park.
The first is 22 acres in Washington Park, extending west to the Garfield Boulevard CTA station by Martin Luther King Jr. Drive. The second location is 21 acres in Jackson Park, not far from the Museum of Science and Industry.
The university is promising to replace any park land it takes for the project and disclosed some suggestions of where the new green space could be relocated.
For further details about the land acquisition plans, read the Chicago Sun-Times report by Lynn Sweet.
Rendering of what the developed area on Jackson Park would look like. Courtesy SOM
Related Stories
| Sep 18, 2012
Firestone Building Products launches new website
Deep product information and innovative customer support tools are highlights.
| Sep 13, 2012
Leo A Daly Company promotes Kraskiewicz to senior vice president
Kraskiewicz, who most recently served as chief operations officer for the Leo A Daly division, will guide brand management, business development, operations and financial performance for 18 offices worldwide.
| Sep 13, 2012
Acentech adds audiovisual expertise to Trevose, Penn. office
Artese focuses on advising, overseeing, and maintaining the client’s vision for the project from the initial kick-off meeting to the final commissioning of the completed systems.
| Sep 13, 2012
Margulies Perruzzi Architects completes office design for Pioneer Investments
MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.
| Sep 12, 2012
Harvesting new ways to eliminate waste at the USDA
After installing 20 high-speed, energy-efficient hand dryers in restrooms throughout the USDA headquarters; the USDA reports seeing an immediate 50% reduction in the use of paper towels.
| Sep 11, 2012
RTKL appoints Lance Hosey as Chief Sustainability Officer and Senior Vice President
Author and authority on green design to spearhead RTKL Performance-driven DesignSM initiative.
| Sep 11, 2012
McQuade appointed CEO of Tishman Construction
McQuade will focus on driving the growth of the company into new markets and expanding market share in its current areas of operation.
| Sep 11, 2012
Ecosystem Management & Associates joins HDR
EM&A staff will do business as part of HDR Engineering and HDR Environmental, Operations and Construction.
| Sep 10, 2012
Specialty door types—plenty of functional variety
In the MasterFormat section 08 30 00, Specialty Doors and Frames, a number of door types are listed for special functions, access locations, sliding and folding hardware, and even pressure-resistant types.
| Sep 7, 2012
7 Do's and Don'ts for PV roof rack installation
As PVs grow in popularity, nearly half of all installations require roof rack systems. Our expert tells how to do the job right and protect your client’s roof.