flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The University of Chicago Medicine is building its city’s first freestanding cancer center with inpatient and outpatient services

Healthcare Facilities

The University of Chicago Medicine is building its city’s first freestanding cancer center with inpatient and outpatient services

The $815 million project will consolidate care currently spread across five buildings and will have a capacity for up to 200,000 outpatient visits and 5,000 inpatient admissions per year.


By Novid Parsi, Contributing Editor | November 3, 2023
UChicago Medicine first freestanding cancer center TOWER FINAL Rendering courtesy CannonDesign
Rendering courtesy CannonDesign

The University of Chicago Medicine (UChicago Medicine) is building Chicago’s first freestanding cancer center with inpatient and outpatient services. Aiming to bridge longstanding health disparities on Chicago’s South Side, the $815 million project will consolidate care and about 200 team members currently spread across at least five buildings. 

The new facility, which broke ground in September, is expected to open to patients in spring 2027.

Designed by CannonDesign in collaboration with Blue Cottage of CannonDesign and Yazdani Studio, the center will serve both patient and academic needs by supporting the research, diagnosis, treatment, and prevention of cancer. It will have a capacity for up to 200,000 outpatient visits and 5,000 inpatient admissions per year.

The 575,000-sf, seven-story building, with room for expansion, will offer 80 inpatient beds (64 medical-surgical beds and a 16-bed ICU), 90 consultation and outpatient exam rooms, and an urgent care clinic that protects immunocompromised cancer patients from extended emergency room visits. To promote patient comfort and privacy, private infusion bays will be grouped by cancer type.

To improve the patient experience, the new facility will provide support services for patients and their families—including lifestyle classes, nutrition education, survivor support, music therapy, fitness classes, and a retail store selling cancer-specific products such as wigs or clothing with openings for ports. Family-friendly features also will include showers and on-site laundry machines, inpatient family dining areas, and larger consultation rooms for patients who attend appointments with loved ones.

In addition to a ground floor that serves both the University of Chicago campus and the surrounding neighborhood, amenities include a café, wellness and meeting spaces, public art, educational opportunities, and a publicly accessible garden.

The project will create more than 500 construction jobs and will give at least 41% of $435 million in construction contracts to minority- and women-owned firms.

On the Building Team:
Owner: University of Chicago Medicine (UChicago Medicine)
Design architect and architect of record: CannonDesign
MEP engineer: Affiliated Engineers with RTM Engineers
Structural engineer: Thornton Tomasetti
Contractor: Turner Construction

UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign

 

 

Related Stories

Healthcare Facilities | Mar 27, 2020

Designing healthcare for surge capacity

We believe that part of the longer-term answer lies not just with traditional health providers, but in the potential of our cities and communities to adapt and change.

Modular Building | Mar 17, 2020

Danish hospital is constructed from 24 steel frame modules

Onsite construction was completed in two weeks.

Healthcare Facilities | Mar 9, 2020

Mobile wayfinding platform helps patients, visitors navigate convoluted health campuses

Gozio Health uses a robot to roam hospital campuses to capture data and create detailed maps of the building spaces and campus.

Healthcare Facilities | Feb 28, 2020

Valleywise Health Medical Center breaks ground in Phoenix

Cuningham Group Architecture and EYP designed the project.  

Healthcare Facilities | Feb 27, 2020

Milieu: Creating restorative environments in behavioral health

It’s time to take a closer look at the collection of therapeutic settings known as milieu.

Healthcare Facilities | Feb 11, 2020

New York City’s largest freestanding cancer center opens

The building creates a model for 21st century cancer care.

Healthcare Facilities | Feb 3, 2020

China builds 645,000-sf coronavirus hospital in 10 days

The project began construction on Jan. 23.

Healthcare Facilities | Jan 30, 2020

The complex dance of healthcare transitioning

Hospital employees, though excited about technological advancements, are expected to navigate a new workplace and care for their patients at the same time, all while training on new equipment and navigating a new building.

Healthcare Facilities | Jan 15, 2020

Top 4 healthcare design trends that will shape medical planning in the 2020s

For patients and healthcare staff, these developments will be most evident in new tools, such as robotic surgical tables and intra-hospital delivery drones, that improve healthcare services and outcomes.

Architects | Jan 6, 2020

Merger expands HED’s presence in SoCal

Puchlik Design Associates, its new addition, specializes in healthcare design.

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021