flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions


By By BD+C Staff | October 25, 2011
This system is for light commercial structures such as restaurants and retail outlets as well as strip-mall stores.

UFP Western Division, Inc. has teamed up with Earthbound Corporation, a Gebrueder-Thiele company, to provide stronger, cost effective solutions for framing slab-on-grade light commercial structures using the Intact Structural Frame system.

The Intact Structural Frame is a marriage of engineered wood and state of the art anchor technology that forms a complete structural frame and provides a stronger, more cost-effective solution for framing slab-on-grade light commercial structures. The system anchors the structure into the foundation, creating a continuous load path around its perimeter. By anchoring from the roof system to the foundation, uplift and overturning are resisted both during seismic events and extreme wind conditions like tornados and hurricanes. This system also uses a self-actuating, shrinkage-compensation device that tightens connections as the foundation settles. During an extreme wind or seismic event, the system will help prevent the building from gaining the momentum that can lead to collapse and destruction.

This patent-pending building system has cost- and time-savings benefits of wood construction, while rivaling concrete and steel in its ability to withstand high load criteria (snow, wind, seismic).

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks. This system is for light commercial structures such as restaurants and retail outlets as well as strip-mall stores. Intact Structural Frame components can be used in virtually any light commercial building application that employs steel or concrete masonry in its structure. BD+C

Related Stories

| Mar 5, 2012

Tishman constructing new courthouse in Philadelphia

Construction is underway for the Pennsylvania Department of General Services’ 510,000-sf facility.

| Mar 5, 2012

Perkins Eastman pegs O’Donnell to lead K-12 practice

O’Donnell will continue the leadership and tradition of creative design established by firm Chairman and CEO Bradford Perkins FAIA, MRAIC, AICP in leading this market sector across the firm’s 13 offices domestically and internationally.

| Mar 5, 2012

Moody+Nolan designs sustainable fire station in Cincinnati

Cincinnati fire station achieves LEED Gold certification.

| Mar 5, 2012

Gilbane Building Co. wins top honors at ASA Houston awards ceremony

Gilbane was also named General Contractor of the Year for the seventh time in 11 years and won the inaugural Safety Program of the Year award.

| Mar 5, 2012

Franklin Institute in Philadelphia selects Skanska to construct new pavilion

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.

| Mar 2, 2012

By the Numbers

66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs. 

| Mar 1, 2012

Intelligent construction photography, not just pretty pictures

Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.

| Mar 1, 2012

AIA: A clear difference, new developments in load-bearing glass

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Mar 1, 2012

8 tips for architects to consider before LED installation

Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021