UFP Western Division, Inc. has teamed up with Earthbound Corporation, a Gebrueder-Thiele company, to provide stronger, cost effective solutions for framing slab-on-grade light commercial structures using the Intact Structural Frame system.
The Intact Structural Frame is a marriage of engineered wood and state of the art anchor technology that forms a complete structural frame and provides a stronger, more cost-effective solution for framing slab-on-grade light commercial structures. The system anchors the structure into the foundation, creating a continuous load path around its perimeter. By anchoring from the roof system to the foundation, uplift and overturning are resisted both during seismic events and extreme wind conditions like tornados and hurricanes. This system also uses a self-actuating, shrinkage-compensation device that tightens connections as the foundation settles. During an extreme wind or seismic event, the system will help prevent the building from gaining the momentum that can lead to collapse and destruction.
This patent-pending building system has cost- and time-savings benefits of wood construction, while rivaling concrete and steel in its ability to withstand high load criteria (snow, wind, seismic).
The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks. This system is for light commercial structures such as restaurants and retail outlets as well as strip-mall stores. Intact Structural Frame components can be used in virtually any light commercial building application that employs steel or concrete masonry in its structure. BD+C
Related Stories
| Oct 30, 2012
Wight & Company announces three hires
Expands team and adds staff to work on the UNO project.
| Oct 15, 2012
Silicones from Dow Corning solve high-altitude technical challenges at the world’s tallest tower
The spectacular Burj Khalifa skyscraper soars to 828m above ground level, holding the record for being the world’s tallest building and also for the highest installation of an aluminum and glass façade. To take on its numerous challenges and technical difficulties, it required proven silicone solutions and full support from Dow Corning.
| Oct 15, 2012
Three new members elected to AISC Board of Directors
New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.
| Oct 11, 2012
Hank Adams Named to Lead HDR’s Healthcare Program
With more than 25 years of experience, HDR vice president is tapped to lead firm's healthcare projects.
| Oct 10, 2012
Foster + Partners to Design New 425 Park Avenue Tower
Conceptual designs submitted by Foster, Hadid, Koolhaas and Rogers to be on exhibit during Municipal Art Society’s Annual Symposium
| Oct 9, 2012
AIA billings index sounds a positive note
The so-called new projects index was at a relatively healthy 57.2, up from 56.3 the previous month.
| Oct 9, 2012
Celebrating brick in architecture
The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials.
| Oct 5, 2012
2012 Reconstruction Award Special Recognition: Joplin Interim High School, Joplin, Mo.
At 5:41 p.m. CDT on Sunday, May 22, 2011, an EF5 tornado touched down in Joplin, Mo. In the next 31 minutes, the mile-wide, multiple-vortex tornado, with winds up to 250 mph, destroyed two thousand buildings, including Joplin High and nine other schools.
| Oct 5, 2012
2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.
Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.
| Oct 5, 2012
2012 Reconstruction Award Bronze Winner: Pomeroy Senior Apartments, Chicago, Ill.
The entire interior of the building was renovated, from the first floor lobby and common areas, to the rooftop spaces. The number of living units was reduced from 120 to 104 to allow for more space per unit and comply with current accessibility requirements.