flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Union Square’s first ground-up development in two decades completes

Mixed-Use

Union Square’s first ground-up development in two decades completes

MBH Architects, in collaboration with Page & Turnbull, designed the project.


By David Malone, Associate Editor | January 20, 2021
300 Grant

Photos courtesy of Matthew Anderson

300 Grant Avenue, a 70.000-sf mixed-use project, has been completed, making it the first new ground-up development in San Francisco’s Union Square in over 20 years. The project includes approximately 28,100 sf of retail and 41,500 sf of Class A office space.

The project sits within the historic Kearny/Market/Mason/Sutter Conservation district and is inspired and defined by classical proportions and modern detailing.

 

300 Grant in San Francisco's Union Square

 

The six-story building features three levels of boutique office spaces above three floors of high-street retail spaces. Interior spaces are flooded with abundant natural light thanks to floor-to-ceiling windows. Horizontal scrim with a terra cotta finish wraps the top four floors to provide a sense of privacy and sunlight diffusion. 

A formerly underutilized side alley was transformed into a publicly-accessible parklet, complete with permanent and temporary seating and a wind-generated public art component, to meld the public areas with the private tenant spaces.

Tags

Related Stories

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Casino Queen breaks ground on $2.15 million entertainment venue

The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.

| Aug 11, 2010

Outdated office tower becomes Nashville’s newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021