flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Uneven snow load concern prompts structural study of Minnesota college auditorium roof

Uneven snow load concern prompts structural study of Minnesota college auditorium roof

The roof of the Memorial Auditorium of Concordia College in Minnesota will undergo a complete structural analysis.


By BD+C Staff | November 6, 2013

The roof of the Memorial Auditorium of Concordia College in Minnesota will undergo a complete structural analysis because it was built to 1946 codes and may not be able to accommodate uneven snow loads. The roof came under scrutiny after basketball players noticed that the ceiling-mounted hoops had dipped below regulation height.

"Snow load calculations now take into consideration unbalanced loads, unequal distribution, the composition and weight of the snow," said Wayne Flack, facilities management director.

(http://www.inforum.com/event/article/id/416952/group/News/)

Related Stories

Codes and Standards | Dec 16, 2020

New Specifications for Concrete Construction reference manual released

Scope expanded to include shotcrete, internal curing, mineral fillers, and recycled concrete aggregates.

Codes and Standards | Dec 15, 2020

Despite COVID-19 population flight, don’t write off big cities yet

Lure of urban life and jobs may draw people back after pandemic subsides.

Codes and Standards | Dec 10, 2020

Test method for vertical fenestration installation procedures updated

FGIA issues first update for document created in 2005.

Codes and Standards | Dec 9, 2020

Newly formed Rainscreen Association aims to be recognized authority on rainscreen assemblies

Will address innovations in material performance and building designs.

Codes and Standards | Dec 9, 2020

Investors want building resiliency plans and risk mitigation practices

Owners should assess risk, insurance coverage, and ability to withstand disasters.

Codes and Standards | Dec 4, 2020

OSHA cites more than 200 employers for COVID-19 violations

Agency releases guidance on lessons learned from pandemic inspections.

Codes and Standards | Dec 1, 2020

Pandemic spurs nearly 16 million people to move from major cities

Most of the movement seems permanent.  

Codes and Standards | Nov 30, 2020

USGBC ready to catalyze LEED Positive future

New programs, updates will spur shift to regenerative strategies.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021