flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Under40 Leadership Summit draws 71 young leaders to Chicago

Under40 Leadership Summit draws 71 young leaders to Chicago

More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”


By By Robert Cassidy | November 11, 2012
Dont touch the ivyits historic! The U40 Leadership Summit participants assemb
Dont touch the ivyits historic! The U40 Leadership Summit participants assembled before the 400-foot centerfield sign at Wrig
This article first appeared in the November 2012 issue of BD+C.

More than 70 young—that is, under age 40—architects, engineers, and construction professionals descended on Chicago in early October with one thought in mind: to learn how to “create with clarity.”

That was the theme of Building Design+Construction’s Second Annual “Under40 Leadership Summit,” held October 3-5 in partnership with AIA Chicago. The program brought together past honorees in BD+C’s “40 Under 40” program with under-40 AEC professionals nominated by their respective firms for networking and interactive leadership development.

The two-and-a-half-day program got started Wednesday afternoon, October 3, with a two-hour tour of Chicago’s architectural heritage along the Chicago River. A docent from the Chicago Architecture Foundation provided an articulate commentary on more than 50 architectural treasures, including works by Harry Weese, Bertrand Goldberg, SOM, and Perkins+Will.

Later that evening, the U40 attendees assembled at the Hotel Monaco, where Autodesk Fellow Tom Wujec, the Summit’s principal facilitator, led them in “The Great Chicago Marshmallow Challenge.” Teams of three or four were given 20 sticks of spaghetti, a yard of tape, a yard of string, and a marshmallow. They had 18 minutes to erect the tallest structure they could, with the stipulation that the marshmallow had to be on top.

Several structures collapsed. Participants were surprised by how much the marshmallow weighed. The winning structure measured 29½ inches in height—about average, according to Wujec, but well short of the record (more than 50 inches). No marshmallows were eaten during the competition (it happens, Wujec says).

Thursday, October 4, was devoted entirely to Wujec’s “Create with Clarity” mobile workshop. Wujec started the group off with what seemed to be a simple exercise: without using words, visualize—through drawing—how to make toast.

Where they came from


The following organizations were represented at the U40 Leadership Summit:

Adrian Smith + Gordon Gill, Argonne National Laboratory, Arquitectonica, BSA LifeStructures, Contract Management Inc. Dewberry, DLR Group, Enclos – Advanced Technology Studio, G3 Construction Group, Gensler, Harley Ellis Devereaux, HDR Architecture, Heery International, Hill International, HKS Architects, HMC Architects, Hoar Program Management, HOK, Johnson Controls, KJWW Engineering Consultants, KLMK Group, Legat Architects, Montalba Architects, Mortenson, Niles Bolton Associates, Norcon Inc., O’Brien Construction, Pepper Construction, Perkins+Will, Playground Ideas, Reichgott Engineering, Rogers Krajnak Architects, roomTEN Design, Ryan Companies US, School of the Art Institute of Chicago, SmithGroupJJR, Solomon Cordwell Buenz, Swinerton Builders, Syska Hennessy Group, Tarlton Corporation, Tilton Kelly + Bell, TLC Engineering for Architecture, University of Illinois at Urbana-Champaign, UrbanWorks, Valerio Dewalt Train Associates, VOA Associates, Walker Parking Consultants, Walter P Moore & Associates, and Wight & Co.

Teams of six to eight then each took on a specific question related to their professional or personal lives. Among the topics: How do we grow our firm? How do we use technology more wisely? How do we balance the demands of work with the needs of our personal lives and families?

The teams then went out into the city—to the North Michigan Avenue “Magnificent Mile,” to the Lake Michigan lakefront, to Millennium Park. Their mission: to find inspiration that would help them present a visual representation of their question—and even a solution.

Upon their return, the teams engaged in extensive development of the oversize posters for their visual presentations, a couple of which also took the form of a skit. Final presentations were made in rapid order,

Wujec then led the entire group in a discussion of the meaning of the visualizations and how to apply the process and concepts learned in their daily work and personal lives.

To the Friendly Confines

Friday, October 5, opened with an early morning bus ride to Wrigley Field, home of the Chicago Cubs, where the group was greeted by Tom Ricketts, the team chairman, Steven J. Jacobsen, SCDP, President of Jacobsen Development Advisors, and Carl Rice, Vice President of Baseball Operations for the Cubs.

Jacobsen, who has been retained by the Cubs to create the business plan and high-level concepts for the renovation of the nearly century-old sports facility, and Rice, who has worked for the Cubs since his high school days, provided an in-depth discussion of the history and evolution of the ballpark, from its days as Weeghman Park (1914) to the installation of lights (1988) and up to current plans for improvements to the electrical and structural systems.

They then led U40 participants on an hour-long tour of the park, from the bowels of the locker room to the heights of the upper deck.

The U40 Leadership Summit ended with a hot dog lunch at the Cubby Bear, a Wrigleyville sports and entertainment landmark.

Participants earned up to 11.0 AIA/CES Discovery learning units for attending all sessions.

Sponsors for the U40 Summit: Andersen Windows and Doors, the Vinyl Institute, SAGE Electrochromics, Georgia-Pacific, the American Institute of Steel Construction, and Sprint. +

Related Stories

Contractors | Oct 5, 2022

Materials shortages, cost spikes throwing Design-Bid-Build process out of whack

The traditional Design-Bid-Build delivery process is under considerable stress this year as materials shortages and cost spikes are upending usual practices, according to a new report from JLL.

Green | Oct 5, 2022

In California, a public power provider’s new headquarters serves as a test case for an innovative microgrid and for reducing greenhouse gas emissions

Sonoma Clean Power (SCP), the public power provider for California’s Sonoma and Mendocino Counties, recently unveiled its new all-electric headquarters.

Contractors | Oct 4, 2022

Which comes first, the building or the cost estimate?

At the start of a project, don’t forget to establish financial parameters when you’re discussing the design and program. By establishing the costs up front, you can avoid the pitfalls that might derail your project and guarantee its lasting success.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

| Oct 4, 2022

In dire need of affordable housing, Aspen, Colo. will get a development that provides 277 affordable homes

A few miles from downtown Aspen, Colo., a development will provide 277 new affordable homes for an area experiencing a dire affordable housing crisis.

Green | Oct 3, 2022

California regulators move to ban gas heaters for existing buildings

California regulators voted unanimously recently on a series of measures that include a ban on the sale of natural gas-powered heating and hot water systems beginning in 2030.

| Oct 3, 2022

The College of the Holy Cross completes a $110 million performing arts center

In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center.

Resiliency | Sep 30, 2022

Designing buildings for wildfire defensibility

Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.

| Sep 30, 2022

Manley Spangler Smith Architects partners with PBK in strategic merger

Manley Spangler Smith Architects (MSSA), a Georgia-based, full-service architectural firm specializing in educational and municipal facilities, announced today a significant development aimed at increasing its capabilities, expertise, and suite of services. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021